Environmental Review Distributions
(Includes ERs distributed for the last 4 months - Memorandums that indicate an attachment will be provided to the bureau NEPA contacts by regular mail)
| Date Posted |
ER Number |
Agency/Review Due Date |
Title |
Bureaus Addressed |
PDF |
| 11/20/09 |
09/1193 |
12/24/09 |
DEIS FOR TRAVEL MANAGEMENT ON THE NEBRASKA NF, BUFFALO GAP NATIONAL GRASSLAND, OGLALA NATIONAL GRASSLAND, AND THE SAMUEL R. McKELVIE NF (ADMINISTERED BY THE NEBRASKA NF), FALL RIVER, CUSTER, PENNINGTON, AND JACKSON COUNTIES, SD, AND SIOUX, DAWES, CHERRY, THOMAS, AND BLAINE COUNTIES, NE |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/20/09 |
09/1192 |
12/23/09 |
CONSTRUCTION OF AN INTERMODAL TRANSIT CENTER PROJECT ON THE EXISTING CAPITOL CORRIDOR LINE LOCATED IN HERCULES, CA [NOI] |
BIA, BLM, FWS, GS, NPS |
|
| 11/20/09 |
01/714 |
|
ADOPTION OF FEIS FOR BART EXTENSION INTO OAKLAND INTL AP, ALAMEDA COUNTY, CA [FEIS] |
BIA, BLM, FWS, GS, NPS |
|
| 11/19/09 |
09/1190 |
12/11/09 |
CADEVILLE GAS STORAGE JAMES SAND FACILITY, NOTICE OF APPLICATION, OUACHITA PARISH, LA |
FWS, GS, NPS,OSM |
|
| 11/19/09 |
09/1189 |
12/28/09 |
PROPOSED RULE INCORPORATE BY REFERENCE VERSION 1.9 STANDARDS FOR BUSINESS PRACTICE OF INTERSTATE NATURAL GAS PIPELINES |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 11/19/09 |
09/1188 |
11/30/09 |
PROPOSED RULE OF WESTERN PACIFIC FISHERIES REGULATORY RESTRUCTURING TO GEOGRAPHIC AREAS |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 11/19/09 |
09/1187 |
01/04/10 |
NEWTON FALLS EAST HYDROELECTRIC PROJECT, FERC NO. 13604-000, APPLICATION FOR PRELIMINARY PERMIT, TRUMBALL COUNTY, OH |
FWS, GS, NPS |
|
| 11/19/09 |
09/1186 |
01/04/10 |
HAP CREMEAN WATER TREATMENT PLANT HYDROELECTRIC PROJECT, FERC NO. 13603-000, APPLICATION FOR PRELIMINARY PERMIT, FRANKLIN COUNTY, OH |
FWS, GS, NPS |
|
| 11/19/09 |
09/625 |
12/14/09 |
FEIS FOR THE BEAVERSLIDE TIMBER SALE AND FUEL TREATMENT PROJECT, MAD RIVER RANGER DISTRICT, SIX RIVERS NF, TRINITY COUNTY, CA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 11/19/09 |
08-1083 |
12/15/09 |
TH-14,FROM I-35 TO TH-56, STEELE AND DODGE COUNTIES, MN [FEIS4F] |
BIA, FWS, GS, NPS |
|
| 11/18/09 |
09/1185 |
12/21/09 |
IMPROVEMENTS TO HANA HIGHWAY BETWEEN THE HANA HIGHWAY/HALEAKALA HIGHWAY INTERSECTION AND MILIKO GULCH, MAUI COUNTY, HI [NOI] |
FWS, GS, NPS |
|
| 11/18/09 |
09/1184 |
12/10/09 |
PROPOSED 2010 ANNUAL DETERMINATION FOR SEA TURTLE OBSERVER REQUIREMENTS, T&E SPECIES, PROPOSED RULE |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 11/18/09 |
09/1183 |
12/28/09 |
DEIS FOR THE FREMONT-WINEMA NFs INVASIVE PLANT TREATMENT, KLAMATH AND LAKE COUNTIES, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/18/09 |
09/1182 |
12/14/09 |
DEIS FOR THE CRIMINAL ALIEN REQUIREMENT 9 PROJECT TO HOUSE UP TO 2,500 FEDERAL, LOW SECURITY, ADULT MALE, NON-U.S. CITIZEN, CRIMINAL ALIENS AT CONTRACTOR-OWNED, CONTRATOR-OPERATED CORRECTIONAL FACILITIES LOCATED IN BALDWIN, LAKE COUNTY, MI AND-OR LAKE CITY, COLUMBIA COUNTY, FL |
FWS, GS, NPS |
|
| 11/18/09 |
09/334 |
12/21/09 |
FEIS AND ROD FOR THE SALT TIMBER HARVEST AND FUEL REDUCTION PROJECT, HAYFORK RANGER DISTRICT, SHASTA-TRINITY NF, TRINITY COUNTY, CA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 11/17/09 |
09/1181 |
01/04/10 |
BYRON WESTON DAM NO. 2 HYDROELECTRIC GENERATION PROJECT, FERC NO. 13583-000, APPLICATION FOR PRELIMINARY PERMIT, BERKSHIRE COUNTY, MA |
FWS, GS, NPS |
|
| 11/17/09 |
09/1180 |
12/18/09 |
REYNOLDS CREEK HYDROELECTRIC PROJECT, FERC NO. 11480-017, APPLICATION FOR TRANSFER OF LICENSE, PRINCE OF WALES ISLAND, ALASKA |
BIA, BLM, FWS, GS, NPS |
|
| 11/17/09 |
09/1179 |
01/04/10 |
GRAND RAPIDS HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, WOOD COUNTY, OH |
FWS, GS, NPS |
|
| 11/17/09 |
09/1178 |
01/04/10 |
INDEPENDENCE DAM HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, DEFIANCE COUNTY, OH |
FWS, GS, NPS |
|
| 11/17/09 |
09/1177 |
12/14/09 |
ELK CITY STORAGE EXPANSION PROJECT, NOI TO PREPARE ENVIRONMENTAL ASSESSMENT, MONTGOMERY COUNTY, KS
|
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 11/17/09 |
09/1176 |
12/28/09 |
SINGLE NUCLEAR UNIT AT THE BELLEFONTE SITE, JACKSON COUNTY, AL {DEIS} |
FWS, GS, NPS,OSM |
|
| 11/17/09 |
09/1175 |
12/28/09 |
HURRICANE AND STORM DAMAGE REDUCTION PROJECT, MID REACH SEGMENT, BREVARD COUNTY, FL {DEIS} |
BIA, FWS, GS, NPS |
|
| 11/17/09 |
09/1174 |
01/09/10 |
PROPOSED CONSTRUCTION OF LOWER BIOS D'ARC CREEK RESERVOIR, FANNIN COUNTY, TX {NOI: EIS} |
FWS, GS, NPS,BOR,OSM |
|
| 11/17/09 |
09/1173 |
12/14/09 |
CEQ REVISION OF FOIA REGULATIONS |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 11/16/09 |
09/1172 |
12/07/09 |
APEX EXPANSION PROJECT OF KERN RIVER GAS TRANSMISSION COMPANY, FROM THE RECEIPT PPOINTS IN LINCOLN COUNTY, WYOMING, TO PECOS DELIVERY POINT IN CLARK COUNTY, NEVADA |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 11/16/09 |
09/1171 |
01/06/09 |
SADDLE ROAD (STATE ROUTE 200), MAMALAHOA HIGHWAY (STATE ROUTE 190) TO MILEPOST 41, COUNTY AND STATE OF HAWAII [DES4F] |
FWS, GS, NPS |
|
| 11/16/09 |
09/1170 |
01/15/10 |
DEVELOPMENT OF HIGH-CAPACITY FIXED-GUIDEWAY TRANSIT IMPROVEMENTS IN THE NORTH METRO CORRIDOR, DENVER AND ADAMS COUNTIES, CO [DES4F] |
BIA, BLM, FWS, GS, NPS |
|
| 11/16/09 |
09/1169 |
01/04/10 |
ADLER CANYON PUMPED STORAGE HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MARICOPA COUNTY, AZ |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/16/09 |
09/1168 |
12/04/09 |
OSAGE HYDROELECTRIC PROJECT, NOTICE OF APPLICATION FOR AMENDMENT OF LICENSE, CAMDEN COUNTY, MISSOURI |
FWS, GS, NPS,BLM |
|
| 11/16/09 |
09/1164 |
01/30/10 |
DEIS FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, GOODHUE CO, MN |
FWS, GS, NPS |
|
| 11/16/09 |
09/1163 |
12/14/09 |
NOI FOR INDUSTRIAL GASIFICATION FACILITY, JACKSON CO, MS |
BIA, FWS, GS, NPS,MMS |
|
| 11/16/09 |
09/1162 |
12/14/09 |
NOI FOR INDUSTRIAL GASIFICATION FACILITY, SPENCER CO, IN |
FWS, GS, NPS |
|
| 11/16/09 |
09/1154 |
12/21/09 |
DEIS FOR THE PIUTE FIRE RESTORATION PROJECT, KERN RIVER RANGER DISTRICT, SEQUOIA NF, KERN COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/13/09 |
09/1167 |
12/21/09 |
TRANSPORTATION IMPROVEMENTS FOR THE DEPARTMENT OF HOMELAND SECURITY HEADQUARTERS CONSOLIDATION AT ST. ELIZABETHS, WASHINGTON, DC - 4F |
FWS, GS, NPS |
|
| 11/13/09 |
09/1166 |
02/01/10 |
DRAFT EIS AND MULTISPECIES HABITAT CONSERVATION PLAN, SOUTHWEST PACIFIC REGION OF NMFS |
BIA, BLM, BOR, FWS, GS, NPS,MMS |
|
| 11/13/09 |
09/1165 |
12/16/09 |
DEIS AMENDMENT 31 TO FMP FOR REEF FISH RESOURCES, ADDRESSES BYCATCH OF SEA TURTLES IN THE BOTTOM LONGLINE, GULF OF MEXICO |
BIA, FWS, GS, NPS,MMS |
|
| 11/12/09 |
09/1161 |
11/03/09 |
MORRIS SHEPPARD HYDROELECTRIC PROJECT, FERC NO. 1490-050, PALO, PINTO COUNTY, TEXAS |
FWS, GS, NPS |
|
| 11/12/09 |
09/1160 |
12/03/09 |
JUNIPER RIDGE HYDROELECTRIC PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, CONDUIT EXEMPTION, SOLICITING COMMENTS, INTERVENTIONS, RECOMMENDATIONS, TERMS AND CONDITIONS, DESCHUTES COUNTY, OREGON |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/12/09 |
09/1159 |
12/08/09 |
NOI TO PREPARE RECOVERY PLAN FOR THREATENED SOUTHERN DISTINCT POPULATION SEGMENT OF NORTH AMERICAN GREEN STURGEON |
BIA, BLM, BOR, FWS, GS, NPS,MMS |
|
| 11/12/09 |
09/1158 |
12/07/09 |
2010 SPECIFICATIONS AND MANAGEMENT MEASURES FOR ATLANTIC MACKEREL, SQUID, AND BUTTERFISH, FISHERIES OF NORTHEASTERN U.S., PROPOSED RULE |
BIA, FWS, GS, NPS,MMS |
|
| 11/10/09 |
09/1157 |
12/28/09 |
GOSHEN DAM HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, ELKHART COUNTY, IN |
FWS, GS, NPS |
|
| 11/10/09 |
09/1156 |
12/02/09 |
CLYDE RIVER HYDROELECTRIC PROJECT, NOA ENVIRONMENTAL ASSESSMENT FOR AMENDMENT OF LICENSE, ORLEANS COUNTY, VERMONT |
FWS, GS, NPS |
|
| 11/10/09 |
09/1155 |
01/08/10 |
SECTION 203 DRAFT STRATEGY FOR RESTORATION AND PROTECTION OF THE CHESAPEAKE BAY, MD, VA, WV, DE, NY, PA, AND DC |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 11/10/09 |
09/1153 |
12/21/09 |
DEIS FOR THE PROPOSED SALE AND REDEVELOPMENT OF PROPERTY AT 1015 SECOND AVENUE, SEATTLE, KING COUNTY, WA THAT IS ELIGIBLE FOR LISTING ON THE NATIONAL REGISTER OF HISTORIC PLACES |
FWS, GS, NPS |
|
| 11/10/09 |
09/1151 |
11/30/09 |
NOI TO HOLD PUBLIC SCOPING MEETINGS AND PREPARE AN EA FOR THE MINNKOTA POWER COOPERATIVE, INC., CENTER TO GRAND FORKS TRANSMISSION LINE PROJECT, GRAND FORKS, GRIGGS, FOSTER, SHERIDAN, McLEAN, OLIVER, WELLS, TRAIL, AND EDDY COUNTIES, ND |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/10/09 |
09/1150 |
11/30/09 |
NOI FOR THE CALIFORNIA RATTLESNAKE FUEL REDUCTION AND FOREST HEALTH PROJECT, SOUTH FORK MANAGEMENT UNIT, SHASTA TRINITY NF, TRINITY COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/10/09 |
09/1149 |
11/27/09 |
PROPOSED CHANGES IN THE VIRGINIA NATURAL RESOURCES CONSERVATION SERVICE STATE TECHNICAL GUIDE |
FWS, GS, NPS,OSM |
|
| 11/09/09 |
09/1152 |
01/06/10 |
LAKE SHELBYVILLE PROJECT, NOI TO FILE APPLICATION, PAD, SD, STUDY REQUESTS, AND SCOPING, SHELBY COUNTY, IL |
FWS, GS, NPS |
|
| 11/09/09 |
09/1148 |
12/07/09 |
PHASE V EXPANSION PROJECT BY GULFSTREAM NATURAL GAS SYSTEM, NOI TO PREPARE AN ENVIRONMENTAL ASSESSMENT, MANATEE COUNTY, FL |
FWS, GS, NPS,OSM |
|
| 11/09/09 |
09/1147 |
12/07/09 |
BOWERSOCK MILLS AND POWER COMPANY KANSAS RIVER PROJECTS, NOI TO FILE LICENSE APPLICATION, FILING OF PAD, AND USE OF TLP, DOUGLAS COUNTY, KS |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/09/09 |
09/788 |
12/07/09 |
FEIS AND ROD FOR THE DEADLOG VEGETATION MANAGEMEMT PROJECT, BEND-FORT ROCK RANGER DISTRICT, DESCHUTES NF, DESCHUTES COUNTY, OR |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 11/06/09 |
09/1146 |
02/02/10 |
NORTHMET PROJECT, OPEN PIT MINE AND PROCESSING FACILITY, MN {DEIS} |
BIA, FWS, GS, NPS |
|
| 11/05/09 |
09/1145 |
12/21/09 |
FOREST CITY PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, WASHINGTON AND AROOSTOCK COUNTIES, ME |
BIA, FWS, GS, NPS |
|
| 11/05/09 |
09/1144 |
12/21/09 |
MINER SHOAL WATERPOWER PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, HEBERSHAM COUNTY, GA |
FWS, GS, NPS |
|
| 11/05/09 |
09/1143 |
12/21/09 |
WEST BRANCH PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, PENOBSCOT, WASHINGTON AND HANCOCK COUNTIES, ME |
BIA, FWS, GS, NPS |
|
| 11/05/09 |
09/1142 |
11/25/09 |
LEABURG-WALTERVILLE HYDRO PROJECT, NOA ENVIRONMENTAL ASSESSMENT FOR AMENDMENT OF LICENSE, LANE COUNTY, OR |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/05/09 |
09/1141 |
12/20/09 |
DEIS FORIGCC PROJECT, KEMPER CO, MS |
BIA, FWS, GS, NPS |
|
| 11/04/09 |
09/1140 |
11/19/09 |
PROPOSED SPECIFICATIONS FOR 2010 SUMMER FLOUNDER, SCUP, AND BLACK SEA BASS FISHERIES, FISHERIES OF THE NORTHEASTERN U.S. |
BIA, FWS, GS, NPS,MMS |
|
| 11/04/09 |
09/1139 |
12/11/09 |
PROPOSED RULE FOR ATLANTIC BLUEFIN TUNA SEASON AND RETENTION LIMIT ADJUSTMENTS, ATLANTIC HIGHLY MIGRATORY SPECIES |
BIA, FWS, GS, NPS,MMS |
|
| 11/04/09 |
09/1138 |
12/28/09 |
PETITION,EA, ANDPLANT RISK ASSESSMENT BY HI-BRED INTERNATIONAL, INC. FOR DETERMINATION OF NON-REGULATED STATUS FOR GENETICALLY ENGINEERED HIGH-OLEIC SOYBEANS |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 11/03/09 |
09/1137 |
12/03/09 |
2011-2012 BIENNIAL HARVEST SPECIFICATIONS AND MANAGEMENT MEASURES FOR THE PACIFIC FMP, NOI TO PREPARE AN EIS, PACIFIC COAST GROUND FISHERY |
BIA, BLM, BOR, FWS, GS, NPS,MMS |
|
| 11/03/09 |
09/1136 |
11/19/09 |
NOI FOR AN EIS FOR THE MOVEMENT OF PLANT PESTS, BIOLOGICAL CONTROL ORGANISMS, AND ASSOCIATED ARTICLES WITHIN THE UNITED STATES |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 11/03/09 |
09/1134 |
12/14/09 |
JOINT READINESS TRAINING CENTER AND FORT POLK LAND ACQUISITION PROGRAM, LA {DEIS} |
FWS, GS, NPS,OSM |
|
| 11/03/09 |
09/1133 |
11/23/09 |
DEIS FOR THE HONEY CREEK-PADUS PROJECT, LAKEWOOD-LAONA RANGER DISTRICT, CHEQUAMEGON-NICOLET NF, FOREST COUNTY, WI |
BIA, FWS, GS, NPS |
|
| 11/03/09 |
09/1132 |
04/01/10 |
NOI FOR AN EIS FOR THE MOUNTAIN CITY, RUBY MOUNTAINS, AND JARBIDGE RANGER DISTRICT COMBINED TRAVEL MANAGEMENT PROJECT, HUMBOLDT-TOIYABE NF, ELKO COUNTY, NV |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/03/09 |
09/1131 |
11/13/09 |
NOI FOR AN EIS FOR THE KINGS RIVER EXPERIMENTAL WATERSHED FOREST HEALTH AND RESEARCH PROJECT (KREW), SIERRA NF, FRESNO COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/03/09 |
09/1130 |
11/12/09 |
NOI FOR AN EIS FOR THE CLEAR PRONG PROJECT, CASCADE RANGER DISTRICT, BOISE NF, VALLEY COUNTY, ID |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/03/09 |
09/1129 |
03/19/10 |
DEIS FOR TANK CLOSURE AND WASTE MANAGEMENT FOR THE HANFORD SITE, RICHLAND, BENTON CO, WA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 11/03/09 |
09/1128 |
01/04/10 |
SITE-WIDE EIS FOR THE Y-12 NATIONAL SECURITY COMPLEX, ANDERSON CO, TN |
FWS, GS, NPS |
|
| 11/03/09 |
09/1127 |
01/28/10 |
MOFFAT COLLECTION SYSTEM PROJECT, CO {DEIS} |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 11/03/09 |
09/1126 |
12/14/09 |
158TH FIGHTER WING VERMONT AIR NATIONAL GUARD PROJECT, VT {DEIS} |
BIA, FWS, GS, NPS |
|
| 11/03/09 |
09-1135 |
12/30/09 |
FORT BLISS ARMY GROWTH AND FORCE STRUCTURE REALIGNMENT PROJECT, TX AND NM {DEIS} |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 11/02/09 |
07/631 |
12/14/09 |
US-36 CORRIDOR, BETWEEN I-25 IN ADAMS COUNTY AND FOOTHILLS PARKWAY/TABLE MESA DRIVE IN BOULDER; ADAMS, DENVER, BROOMFIELD, BOULDER, AND JEFFERSON COUNTIES, CO [FEIS/4F] |
BIA, FWS, GS, NPS |
|
| 10/30/09 |
09/1125 |
12/15/09 |
GREEN HYDROPOWER CHIEF JOSEPH PROJECT, APPLICATION FOR PRELIMINARY PERMIT, DOUGLAS AND OKANOGAN COUNTIES, WA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/30/09 |
09/1124 |
11/30/09 |
INDIAN RIVER PROJECT, FRC NO. 12462, APPLICATION FOR AMENDMENT OF EXEMPTION, HAMPDEN COUNTY, MA |
FWS, GS, NPS |
|
| 10/30/09 |
09/1123 |
12/15/09 |
YUKON RIVER HYDROKINETIC WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SOUTHEAST FAIRBANKS CENSUS AREA, AK |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 10/30/09 |
09/318 |
11/20/09 |
OCCOQUAN RIVE HYDRO PROJECT, SURRENDER OF LICENSE, FINAL EA, PRINCE WILLIAM AND FAIRFAX COUNTIES, VA |
'BIA', 'FWS', 'GS', 'NPS' |
|
| 10/29/09 |
09/1122 |
12/04/09 |
ALTAMONT CORRIDOR RAIL PROJECT FROM STOCKTON TO SAN JOSE, CA [NOI] |
BIA, BLM, FWS, GS, NPS |
|
| 10/29/09 |
09/1121 |
12/28/09 |
PREVENTION OF SIGNIFICANT DETERIORATION AND TITLE V GREENHOUSE GAS TAILORING RULE {PROPOSED RULEMAKING} |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 10/29/09 |
09/1120 |
11/19/09 |
REVIEW OF THE NATIONAL AMBIENT AIR QUALITY STANDARDS FOR CARBON MONOXIDE {DRAFT DOCUMENTS} |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 10/29/09 |
09/1119 |
11/30/09 |
RED ROCK HYDROELECTRIC PROJECT, SOLICITING SCOPING COMMENTS, MARION COUNTY, IA |
FWS, GS, NPS |
|
| 10/29/09 |
09/1118 |
11/20/09 |
YATES AND THURLOW PROJECT, APPLICATION FOR AMENDMENT OF LICENSE, TALLAPOOSA AND ELMORE COUNTIES, AL |
FWS, GS, NPS |
|
| 10/28/09 |
09/1117 |
01/26/10 |
GIBSON DAM HYDROELECTRIC PROJECT, NOTICE SOLICITING SCOPING COMMNETS, LEWIS & CLARK AND TETON COUNTIES, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/28/09 |
09/1116 |
12/01/09 |
ANAHEIM FIXED-GUIDEWAY TRANSIT CORRIDOR STUDY, CITY OF ANAHEIM, ORANGE COUNTY, CA [NOI] |
BIA, BLM, FWS, GS, NPS |
|
| 10/28/09 |
09/1115 |
11/27/09 |
WIDENING AND/OR REALIGNMENT OF STATE ROUTE 603/43 IN HANCOCK AND PEARL RIVER COUNTIES, MS [NOI] |
FWS, GS, NPS |
|
| 10/28/09 |
09/1114 |
12/28/09 |
BOUNDARY HYDRO PROJECT, APPLICATION ACCEPTED FOR FILING AND SOLICITING MOTIONS TO INTERVENE, PEND OREILLE COUNTY, WA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/28/09 |
09/1113 |
11/20/09 |
PROPOSED RULE, ATLANTIC HIGHLY MIGRATORY SPECIES, ATLANTIC COMMERCIAL SHARK MANAGEMENT MEASURES, 2010 FISHING QUOTA ADJUSTMENT FOR SANDBAR SHARKSM NON-SANDBAR LARGE COSATL SHARKS, SMALL COASTAL SHARKS, AND PELAGIC SHARKS |
BIA, FWS, GS, NPS,MMS |
|
| 10/27/09 |
09/1111 |
11/16/09 |
OVERTHRUST MAIN LINE 133 LOOP EXPANSION PROJECT, NOTICE OF APPLICATION, SWEETWATER AND UINTA COUNTIES, WY |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/27/09 |
09/551 |
11/23/09 |
FEIS AND ROD FOR THE MARSH CREEK AND TARHEAD ALLOTMENT MANAGEMENT PLANS, LINCOLN RANGER DISTRICT, HELENA NF, LEWIS AND CLARK COUNTY, MT |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 10/26/09 |
09/1110 |
11/12/09 |
PROPOSED RULE OF TAKING MARINE MAMMALS, MILITARY TRAINING ACTIVIITES, MARINANA ISLAND RANGE COMPLEX |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 10/26/09 |
09/1109 |
12/10/09 |
PROPOSED RULE OF LISTING SPOTTED SEALS DPS IN NORTH PACIFIC OCEAN, T&E SPECIES |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 10/26/09 |
09/1108 |
12/22/09 |
NOA AMENDMENT 16 TO NE MULTIPSECIES FMP, FISHERIES OF THE NORTHEASTERN U.S. |
BIA, FWS, GS, NPS,MMS |
|
| 10/26/09 |
09/1107 |
11/11/09 |
PROPOSED RULE TO ISSUE A LETTER OF AUTHORIZATION, FISHERIES OF THE NORTHEASTERN U.S. |
BIA, FWS, GS, NPS,MMS |
|
| 10/26/09 |
09/1106 |
12/04/09 |
WEST ROSEBUD HYDRO PROJECT, APPLICATION FOR PRELIMINARY PERMIT, CARBON COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/26/09 |
09/1105 |
12/04/09 |
EAST ROSEBUD HYDRO PROJECT, APPLICATION FOR PRELIMINARY PERMIT, CARBON COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/26/09 |
09/1104 |
12/08/09 |
3160 WATER POWER PROJECT AND LACE HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, JUNEAU, AK |
BIA, BLM, FWS, GS, NPS |
|
| 10/26/09 |
09/1103 |
12/08/09 |
MISSISSIPPI RIVER LOCK AND DAM NO. 12 WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, JACKSON COUNTY, IOWA AND JO DAVIESS COUNTY, IL |
BIA, FWS, GS, NPS |
|
| 10/26/09 |
09/1102 |
12/04/09 |
SUTTON PROJECT, APPLICATION FOR PRELIMINARY PERMIT, BRAXTON COUNTY, WV |
FWS, GS, NPS |
|
| 10/26/09 |
09/1101 |
12/08/09 |
R.D. BAILEY DAM HYDRO PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MINGO COUNTY, WV |
FWS, GS, NPS |
|
| 10/26/09 |
09/1100 |
12/08/09 |
MUSKINGUM VALLEY BROOKVILLE DAM HYDRO PROJECT, APPLICATION FOR PRELIMINARY PERMIT, FRANKLIN COUNTY, IN |
FWS, GS, NPS |
|
| 10/26/09 |
09/1099 |
11/20/09 |
BALL MOUNTAIN DAM HYDRO PROJECT, TOWNSHEND DAM HYDRO PROJECT, NOI TO FILE APPLICATION, PAD, USE OF TLP, WINDHAM COUNTY, VT |
FWS, GS, NPS |
|
| 10/26/09 |
09/1098 |
11/20/09 |
NORTHEASTERN TENNESSEE PROJECT, NOI TO PREPARE EA, VIRGINIA AND TENNESSEE |
FWS, GS, NPS,OSM |
|
| 10/26/09 |
09/1097 |
11/10/09 |
COMPRESSOR STATION 420, APPLICATION TO INSTALL ADDITIONAL 20500 HORSEPOWER OF COMPRESSION, MANATEE COUNTY, FL |
FWS, GS, NPS,OSM |
|
| 10/26/09 |
09/1096 |
11/24/09 |
CROWVILLE SALT DOME STORAGE PROJECT, NOA ENVIRONMENTAL ASSESSMENT, FRANKLIN AND RICHLAND PARISHES, LA |
FWS, GS, NPS,OSM |
|
| 10/26/09 |
09/1094 |
11/09/09 |
NOI FOR THE WARM SPRINGS HABITAT ENHANCEMENT PROJECT, HELENA NF, JEFFERSON COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/26/09 |
09/1093 |
11/09/09 |
NOI TO SUPPLEMENT ANEIS FOR THE GEMMILL THIN PROJECT, SHASTA-TRINITY NF, TRINITY COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/26/09 |
09/1092 |
11/09/09 |
CORRECTED NOI FOR AN EIS FOR THE SECTION 30 LIMESTONE MINING PROPOSAL, BLACK HILLS NF, MYSTIC RANGER DISTRICT, PENNINGTON COUNTY, SD |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/26/09 |
09/463 |
11/12/09 |
AMES HYDROELECTRIC PROJECT, FERC NO. 400-051, NOA FINAL ENVIRONMENTAL ASSESSMENT, SAN MIGUEL COUNTY, COLORADO |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 10/26/09 |
09/412 |
11/23/09 |
FEIS FOR THE THOM SEIDER VEGETATION MANAGEMENT AND FUEL REDUCTION PROJECT, KLAMATH NATIONAL FOREST, HAPPY CAMP AND OAK KNOLL RANGER DISTRICTS, SISKIYOU COUNTY, CA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 10/26/09 |
08/272 |
11/09/09 |
FEIS AND ROD FOR THE BUTTE LOOKOUT PROJECT, MISSOULA RANGER DISTRICT, LOLO NF, MISSOULA COUNTY, MT |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS','OSM' |
|
| 10/26/09 |
07/327 |
11/12/09 |
FPEIS TOWARD AN ECOSYSTEM APPROACH FOR THE WESTERN PACIFIC REGION, FROM SPECIES-BASED TO PLACE-BASED FISHERY ECOSYSTEM PLANS |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 10/23/09 |
09/64 |
11/23/09 |
ROUTE 63 IMPROVEMENT, SOUTH OF ROUTE 50 TO SOUTH OF MARIES/PHELPS COUNTY LINE; OSAGE, MARIES, AND PHELPS COUNTIES, MO [FEIS] |
'BIA', 'FWS', 'GS', 'NPS' |
|
| 10/21/09 |
09/1091 |
11/16/09 |
DEIS FOR THE MIDDLE KYLE CANYON COMPLEX PROJECT, SPRING MOUNTAINS NATIONAL RECREATION AREA, HUMBOLDT-TOIYABE NF, CLARK COUNTY, NV |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/21/09 |
09/548 |
11/23/09 |
FEIS AND ROD FOR THE BORDER PROJECT, LA CROIX RANGER DISTRICT, SUPERIOR NF, EASTERN REGION, ST. LOUIS COUNTY, MN |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 10/20/09 |
09/1090 |
11/06/09 |
REVIEW OF THE NATIONAL AMBIENT AIR QUALITY STANDARDS FOR OZONE {DRAFT DOCUMENTS} |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 10/20/09 |
09/617 |
11/10/09 |
NEW JERSEY-PENNSYLVANIA LACKAWANNA CUT-OFF PASSENGER RAIL SERVICE RESTORATIVE PROJECT [REVISED FONSI] |
'FWS', 'GS', 'NPS' |
|
| 10/20/09 |
09/175 |
11/09/09 |
REPLACEMENT OF 6TH STREET BRIDGE, SPALDING COUNTY, GA - [FINAL 4f] |
'FWS', 'GS', 'NPS' |
|
| 10/19/09 |
09/1089 |
12/04/09 |
RUBY RIVER POWER PROJECT, APPLICATION FOR COMPETING PRELIMINARY PERMIT, MADISON COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/19/09 |
09/1088 |
12/04/09 |
TONGUE RIVER POWER PROJECT, APPLICATION FOR COMPETING PRELIMINARY PERMIT, BIG HORN COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/19/09 |
09/1087 |
11/09/09 |
ELK CITY STORAGE FIELD COMPRESSOR PROJECT BY SOUTHERN STAR CENTRAL GAS PIPELINE, NOTICE OF APPLICATION TO INSTALL COMPRESSOR, MONTGOMERY COUNTY, KS |
BIA, BLM, FWS, GS, NPS,OSM |
|
| 10/19/09 |
09/1086 |
11/02/09 |
IMPLEMENT RESTRICTION FOR 2009, 2010 and 2011 PURSE SEINE AND LONGLINE FISHRIES IN THE EASTERN PACIFIC OCEAN, PACIFIC TUNA FISHERIES, INTERNATIONAL FISHERIES, PROPOSED RULE |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 10/19/09 |
09/687 |
11/16/09 |
FEIS AND ROD FOR THE NORTHWEST SANDS RESTORATION PROJECT, WASHBURN RANGER DISTRICT, CHEQUAMEGON-NICOLET NF, BAYFIELD COUNTY, WI |
'BIA', 'FWS', 'GS', 'NPS' |
|
| 10/19/09 |
09/481 |
11/16/09 |
FEIS AND ROD FOR THE GRUB HOE VEGETATION AND TRANSPORTATION MANAGEMENT PROJECT, EAGLE RIVER-FLORENCE RANGER DISTRICT, CHEQUAMEGON-NICOLET NF, FLORENCE COUNTY, WI |
'BIA', 'FWS', 'GS', 'NPS' |
|
| 10/19/09 |
09/209 |
11/16/09 |
WEST COAST BASING OF MV-22, CA AND AZ {FEIS} |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS','OSM' |
|
| 10/19/09 |
08/0035 |
11/16/09 |
FEIS FOR THE THUNDER BASIN NATIONAL GRASSLAND PRAIRIE DOG MANAGEMENT STRATEGY AND LAND AND RESOURCE MANAGEMENT PLAN AMENDMENT NO.3, DOUGLAS RANGER DISTRICT, MEDICINE BOW-ROUTT NFs AND THUNDER BASIN NATIONAL GRASSLAND, CAMPBELL, CONVERSE, NIOBRARA AND WESTON COUNTIES, WY |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 10/16/09 |
09/1085 |
11/17/09 |
STUYVESANT FALLS HYDRO PROJECT, SCOPING COMMNETS AND MEETINGS, COLUMBIA COUNTY, NY |
'BIA', 'FWS', 'GS', 'NPS' |
|
| 10/16/09 |
09/1084 |
11/16/09 |
CUNNINGHAM STORAGE BOUNDARY EXPANSION PROJECT, NOI TO PREPARE EA, PRATT AND KINGMAN COUNTIES, KS |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 10/16/09 |
09/1083 |
12/01/09 |
RED LODGE CREEK POWER PROJECT, APPLICATION FOR COMPETING PRELIMINARY PERMIT, CARBON COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/16/09 |
09/1082 |
11/16/09 |
INTERIM STAFF GUIDANCE ON IMPLEMENTATION OF A SEISMIC MARGIN ANALYSIS FOR NEW REACTOR BASED ON PROBABILISTIC RISK ASSESSMENT |
BIA, BLM, FWS, GS, NPS,OSM |
|
| 10/16/09 |
09/1081 |
10/16/09 |
PIUTE DAM HYDRO PROJECT, APPLICATION FOR PRELIMINARY PERMIT, PIUTE COUNTY, UT |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 10/16/09 |
09/1073 |
11/23/09 |
NORTHEASTERN TRIBUTARY RESERVOIRS LAND MANAGEMENT PLAN, TN AND VA {DEIS} |
BIA, FWS, GS, NPS,OSM |
|
| 10/16/09 |
09/1072 |
11/09/09 |
PROPOSED DALLAS FLOODWAY PROJECT, MULTIPURPOSE PROJECT, DALLAS COUNTY, DALLAS, TX {NOI:DEIS} |
FWS, GS, NPS,BOR,OSM |
|
| 10/15/09 |
09/1080 |
11/06/09 |
HENRY M JACKSON HYDROELECTRIC PROJECT, SETTLEMENT AGREEMENT, SNOHOMISH COUNTY, WA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/15/09 |
09/1077 |
11/16/09 |
FAYETTEVILLE EXPRESS PIPELINE PROJECT, NOA ENVIRONMENTAL ASSESSMENT, AR, MS |
FWS, GS, NPS,OSM |
|
| 10/15/09 |
09/1075 |
11/23/09 |
DEIS FOR THE RATTLESNAKE FOREST MANAGEMENT PROJECT, BEARLODGE RANGER DISTRICT, BLACK HILLS NF, CROOK COUNTY, WY |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 10/15/09 |
09-1079 |
11/09/09 |
IMPROVEMENTS TO THE SC ROUTE 522 AND SC ROUTE 9 INTERSECTION, LANCASTER COUNTY, SC [4F - ARRA-FUNDED] |
FWS, GS, NPS |
|
| 10/15/09 |
09-1078 |
11/27/09 |
ROUTE 250 BYPASS INTERCHANGE IMPROVEMENTS AT MCINTIRE ROAD, CITY OF CHARLOTTESVILLE, VA [REVISED 4F] |
FWS, GS, NPS |
|
| 10/15/09 |
07/206 |
11/26/09 |
NC-12 REPLACEMENT OF HERBERT C. BONNER BRIDGE NO. 11 OVER OREGON INLET, DARE COUNTY, NC [REVISED FINAL 4F] |
FWS,NPS |
|
| 10/14/09 |
09/1974 |
11/23/09 |
DEIS FOR THE TRAVEL MANAGEMENT PROJECT, DESCHUTES NF, OCHOCO NF, AND THE CROOKED RIVER NATIONAL GRASSLAND, DESCHUTES, JEFFERSON, CROOK, KLAMATH, LAKE, GRANT, AND WHEELER COUNTIES, OR |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 10/14/09 |
09/1076 |
11/13/09 |
ELIZABETH WEBBING HYDROELECTRIC PROJECT, APPLICATION FOR TRANSFER OF LICENSE, PROVIDENCE COUNTY, RI |
FWS, GS, NPS |
|
| 10/14/09 |
09/239 |
11/06/09 |
NOA FINAL ENVIRONMENTAL ASSESSMENT FOR APPLICATION FOR AMENDMENT OF LICENSE, POTTER VALLEY HYDROELECTRIC PROJECT, FERC NO. 77-212, LAKE AND MENDOCINO COUNTIES, CALIFORNIA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 10/14/09 |
09/166 |
11/09/09 |
FEIS AND ROD FOR MOTORIZED TRAVEL MANAGEMENT ON THE SEQUOIA NF, TULARE COUNTY, CA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 10/13/09 |
09/1071 |
10/29/09 |
WILLOW MILL HYDROELECTRIC PROJECT, APPLICATION FOR TRANSFER OF LICENSE, BERKSHIRE COUNTY, MASSACHUSETTS |
FWS, GS, NPS |
|
| 10/13/09 |
09/1070 |
11/06/09 |
WALLACE DAM HYDROELECTRIC PROJECT, APPLICATION FOR AMENDMENT OF LICENSE, NON-PROJECT USE OF PROJECT LANDS AND WATERS, GREENE COUNTY, GA |
FWS, GS, NPS |
|
| 10/13/09 |
09/1069 |
11/30/09 |
W. KERR SCOTT HYDROELECTRIC PROJECT, APPLICATION TENDERED FOR FILING, STUDY REQUESTS, WIKES COUNTY, NC |
BIA, FWS, GS, NPS |
|
| 10/13/09 |
09/1068 |
10/30/09 |
MULLINVILLE COMPRESSOR STATION OF NORTHERN NATURAL GAS COMPANY PROJECT, NOTICE OF APPLICATION, KIOWA COUNTY, KS |
BIA, BLM, FWS, GS, NPS,OSM |
|
| 10/13/09 |
09/1067 |
11/24/09 |
MISSISSIPPI RIVER LOCK AND DAM NO. 13 PROJECT, APPLICATION FOR PRELIMINARY PERMIT, CLINTON COUNTY, IA, AND FULTON COUNTY, IL |
BIA, FWS, GS, NPS |
|
| 10/13/09 |
09/1066 |
11/24/09 |
BOULDER CANYON HYDROELECTRIC PROJECT, READY FOR ENVIRONMENTAL ANALYSIS, BOULDER AND GILPIN COUNTIES, CO |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/13/09 |
09/1065 |
11/09/09 |
CULINARY WATER SYSTEM HYDROELECTRIC PROJECT, NOA ENVIRONMENTAL ASSESSMENT, LINCOLN COUNTY, WY |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/13/09 |
09/1064 |
11/27/09 |
DRAFT INTERIM STAFF GUIDANCE 25, PRESSURE AND HELIUM LEAKAGE TESTING OF THE CONFINEMENT BOUNDARY OF SPENT FUEL STORAGE CANISTERS, SOILICITING COMMENTS |
BIA, BLM, FWS, GS, NPS,OSM |
|
| 10/13/09 |
09/1063 |
11/09/09 |
NOI TO PREPARE EIS FOR THE PROPOSED FEDERAL LOAN GUARANTEE TO SUPPORT CONSTRUCTION AND START-UP OF THE TAYLORVILLE ENERGY CENTER, IL |
BIA, FWS, GS, NPS |
|
| 10/13/09 |
09/1062 |
11/09/09 |
SOLICITING COMMENTS, PROPOSED MODEL SAFETY EVALUATION FOR PLANT-SPECIFIC ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE TRAVELER-513, REVISION 2, |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 10/13/09 |
09/1061 |
11/23/09 |
NOI TO PREPARE AN EIS FOR 500-KV TRANSMISSION LINE FOR THE I-5 CORRIDOE REINFORCEMNET PROJECT, COWLITZ AND CLARK COUNTIES, WA, AND MULTNOMAH COUNTY, OR |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 10/13/09 |
09/1060 |
11/03/09 |
PROPOSED RULE OF LIST OF APPROVED SPENT FUEL STORAGE CASKS: HI-STORM 100 REVISION 7 |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/13/09 |
09/1059 |
11/20/09 |
BALDWIN WIND ENERGY DEVELOPMENT PROJECT, SCOPING COMMENTS, BURLEIGH COUNTY, ND |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/13/09 |
09/390 |
11/09/09 |
FINAL SUPPLEMENTAL EIS FOR THE POCKETS RESOURCE MANAGEMENT PROJECT, ESCALANTE RANGER DISTRICT, DIXIE NF, GARFIELD COUNTY, UT |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS','OSM' |
|
| 10/13/09 |
08/1260 |
11/09/09 |
RED DOG MINE EXTENSION-AQQALUK PROJECT, NPDES PERMIT REISSUANCE, CHUKCHI SEA, AK {FEIS} |
'BIA', 'BLM', 'FWS', 'GS', 'NPS','OSM' |
|
| 10/09/09 |
09/1056 |
12/10/09 |
PUGET SOUND NEARSHORE MARINE HABITAT RESTORATION PROJECT, WA {NOI: DPEIS} |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 10/09/09 |
08/988 |
11/06/09 |
UPPER MISSISSIPPI RIVER HEADWATERS, BEMIDJI TO ST. PAUL, MN {FEIS} |
'BIA', 'FWS', 'GS', 'NPS' |
|
| 10/08/09 |
09/1058 |
11/09/09 |
BOUNDARY HYDRO PROJECT, APPLICATION TENDERED FOR FILING, PEND OREILLE COUNTY, WA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/08/09 |
09/1057 |
10/30/09 |
NANTAHALA HYDROELECTRIC PROJECT, FERC NO. 2692, APPLICATION FOR AMENDMENT OF LICENSE, CLAY AND MACON COUNTIES, NC |
FWS, GS, NPS |
|
| 10/08/09 |
09/1055 |
11/23/09 |
SWALLEY IRRIGATION DISTRICT PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, SOLICITING COMMENTS, TERMS, CONDITION, RECOMMENDATION, INTERVENTIONS, DESCHUTES COUNTY, OR |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/08/09 |
09/1054 |
11/07/09 |
EA FOR CRIMINAL ALIEN REQUIREMENT 10 PROJECT-CALIFORNIA CITY CORRECTIONAL CENTER, KERN COUNTY, CA, CIBOLA CORRECTIONAL CENTER, CIBOLA COUNTY, NM, D. RAY JAMES CORRECTIONAL CENTER, CHARLTON COUNTY, GA, AND TALLAHATCHIE CORRECTIONAL CENTER, TALLAHATCHIE COUNTY, MS |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/07/09 |
09/1053 |
11/06/09 |
EA AND FONSI FOR MODIFICATION OF EXEMPTION FROM CERTAIN NRC LICENSING REQUIREMENTS FOR SPECIAL NUCLEAR MATERIAL FOR ENERGYSOLUTION, CLIVE, UT |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 10/07/09 |
09/1052 |
12/07/09 |
DRAFT RECOVERY PLAN FOR CENTRAL VALLEY SALMON AND STEELHEAD, CA |
BIA, BLM, BOR, FWS, GS, NPS,MMS |
|
| 10/07/09 |
09/1051 |
11/16/09 |
RECONSTRUCTION OF 19TH AVENUE NORTH FROM SPRINGDALE DRIVE TO NORTH 2ND STREET & US-67, CITY AND COUNTY OF CLINTON, IOWA [EAS4F] |
FWS, GS, NPS |
|
| 10/06/09 |
09/1049 |
11/27/09 |
PROPOSED RULE TO ESTABLISH LIGH-DUTY VEHICLE GREENHOUSE GAS EMISSION STANDARDS AND CAFE STANDARDS |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 10/06/09 |
09/767 |
11/02/09 |
FEIS AND ROD FOR THE BIG SUMMIT CLUSTER ALLOTMENT MANAGEMENT PLANS, LOOKOUT MOUNTAIN RANGER DISTRICT, OCHOCO NF, CROOK COUNTY,OR |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 10/05/09 |
09/1050 |
11/04/09 |
NOI TO PREPARE EIS FOR FISHERY MANAGEMENT PLANS (FMP) FOR NORTHEAST MULTISPECIES, ATLANTIC SEA SCALLOP, MONKFISH, HERRING, SKATES, ATLANTIC SALMON AND RED CRAB FISHERIES, 5-YEAR REVIEW |
BIA, FWS, GS, NPS,MMS |
|
| 10/05/09 |
09/1048 |
11/20/09 |
CEDAR LAKE DAM HYDROELECTRIC PROJECT, NOTICE APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, SOLICITING COMMNETS, RECOMMENDATIONS, TERMS, CONDITIONS, PRESCRIPTIONS, CHICKASAW COUNTY, IA |
FWS, GS, NPS |
|
| 10/02/09 |
09/1047 |
11/17/09 |
LOS VAQUEROS PIPELINE ENERGY RECOVERY PROJECT, FERC NO. 13524, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, CONTRA COSTA COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 10/02/09 |
09/1046 |
12/17/09 |
PRESIDENTIAL PERMIT APPLICATION FOR SAN DIEGO TIJUANA AIRPORT CROSS BORDER FACILITY, CALIFORNIA AND MEXICO |
BIA, BLM, FWS, GS, NPS |
|
| 10/02/09 |
09/1045 |
12/01/09 |
FISHERY ECOSYSTEM PLANS FOR AMERICAN SAMOA, HAWAII, MARIANA ARCHIPELAGO, PACIFIC REMORE ISLAND AREAS, AND WESTERN PACIFIC PELAGIC FISHERIES, FISHERIES IN THE WESTERN PACIFIC |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 10/02/09 |
09/1044 |
11/02/09 |
LUMINANT TATUM MINE PROJECT, FERC NO. CP09-447-000, NOI TO PREPARE EA, PANOLA COUNTY, TX |
FWS, GS, NPS,BLM,OSM |
|
| 10/02/09 |
09/445 |
10/30/09 |
TACOMA HYDRO PROJECT, FERC NO. 12589-001, NOA FINAL ENVIRONMENTAL ASSESSMENT, LA PLATA AND SAN JUAN COUNTIES, COLORADO |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 10/01/09 |
09/1043 |
11/16/09 |
REPLACEMENT OF THE EXISTING POND EDDY BRIDGE CARRYING SR-1011 OVER THE DELAWARE RIVER BETWEEN SHOHOLA TOWNSHIP, PIKE COUNTY, PA - 4F |
FWS, GS, NPS |
|
| 10/01/09 |
09/1042 |
10/30/09 |
CALIFORNIA HIGH SPEED TRAIN (HST) PROJECT FROM MERCED TO FRESNO, CA - NOI |
BIA, BLM, FWS, GS, NPS |
|
| 10/01/09 |
09/1041 |
10/30/09 |
CALIFORNIA HIGH SPEED TRAIN (HST) PROJECT FROM FRESNO TO BAKERSFIELD, CA - NOI |
BIA, BLM, FWS, GS, NPS |
|
| 10/01/09 |
09/1040 |
10/30/09 |
BLUE SKY GAS STORAGE PROJECT, NOA ENVIRONMENTAL ASSESSMENT, LOGAN COUNTY, CO |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 10/01/09 |
09/1039 |
10/23/09 |
PROPOSED RULE MODIFY FISHING VESSEL PERMIT REGULATIONS, FISHERIES OF THE NORTHEASTERN U.S. |
BIA, FWS, GS, NPS,MMS |
|
| 10/01/09 |
08/386 |
10/26/09 |
NAVAL SURFACE WARFARE CENTER PANAMA CITY DIVISION (NSWC PCD), MISSION ACTIVITIES, FL {FEIS} |
'BIA', 'FWS', 'GS', 'NPS','MMS' |
|
| 10/01/09 |
06/1065 |
10/19/09 |
SOUTHERN CONNECTOR/CHAMPLAIN PARKWAY PROJECT, CITY OF BURLINGTON, CHITTENDEN COUNTY, VT - FSEIS |
FWS, GS, NPS |
|
| 09/30/09 |
09/1038 |
11/13/09 |
GUMBY PROJECT, MS RIVER LOCK AND DAM NO. 9 WATER POWER PROJECT, FERC NO. 13392, APPLICATION FOR PRELIMINARY PERMIT, ALLAMAKEE COUNTY, IA, CRAWFORD COUNTY, WI |
BIA, FWS, GS, NPS |
|
| 09/30/09 |
09/1037 |
11/13/09 |
CLAYTOR HYDROELECTRIC PROJECT, FERC NO. 739, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, PULASKI COUNTY, VA |
BIA, FWS, GS, NPS |
|
| 09/30/09 |
09/1036 |
10/21/09 |
PROPOSED RULE, THE NORTH PACIFIC GROUNDFISH OBSERVER PROGRAM, FISHERIES OF EEZ OFF AK |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 09/30/09 |
09/1035 |
11/13/09 |
LAKE CREEK HYDRO PROJECT, FERC NO. 2594-013, LINCOLN COUNTY, MONTANA, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, SOLICITING COMMENTS, RECOMMNEDATIONS, TERMS AND CONDITION, AND FISHWAY PRESCRIPTIONS |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/29/09 |
09/1034 |
10/29/09 |
ROANOKE RAPIDS AND GASTON PROJECT, NOA ENVIRONMNETAL ASSESSMENT (NON-PROJECT USE OF PROJECT LANDS AND WATERS) WARREN COUNTY, NC |
BIA, FWS, GS, NPS |
|
| 09/29/09 |
09/1033 |
10/28/09 |
NOTICE OF AVAILABILITY AND REQUEST FOR COMMENTS ON AN EA FOR FIELD RELEASE OF BACILLUS THURINGIENSIS APNENSIS, A BACTERIUM FOR BIOLOGICAL CONTROL OF JAPANESE BEETLE, POPILLIA JAPONICA IN FIVE STATES |
FWS, GS, NPS |
|
| 09/29/09 |
09/1032 |
10/20/09 |
PROPOSED RULE OF ANNUAL HARVEST GUIDELINE FOR PACIFIC MACKEREL IN THE EEZ OFF THE PACIFIC COAST |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 09/28/09 |
09/1031 |
10/19/09 |
NORTHERN NATURAL GAS COMPANY SUNRAY COMPRESSOR STATION, NOTICE OF APPLICATION, MOORE COUNTY, TX |
FWS, GS, NPS,OSM |
|
| 09/28/09 |
09/1030 |
10/28/09 |
ARROW CANYON CONDUIT ENERGY RECOVERY HYDROTURBINE PROJECT, FERC NO. 13569, NOI TO FILE APPLICATION, PAD, USE OF TLP, MOAPA, CLARK COUNTY, NV |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/28/09 |
09/1029 |
11/06/09 |
IMPLEMENTATION OF THE REACTOR OVERSIGHT PROCESS, SOLICITING COMMENTS, U.S. |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 09/28/09 |
09/1028 |
10/28/09 |
SOUTHERN NUCLEAR OPERATING COMPANY VOGTLE ELECTRIC GENERATING PLAN UNITS 3 AND 4 COMBINED LICENSE APPLICATION, NOI TO PREPARE A SUPPLEMENTAL EIS, BURKE COUNTY, GA |
FWS, GS, NPS,OSM |
|
| 09/28/09 |
09/1027 |
11/10/09 |
GREENUP HYDROKINETIC PROJECT, FERC NO. 13573, APPLICATION FOR PRELIMINARY PERMIT, SCIOTO COUNTY, OH |
FWS, GS, NPS,MMS |
|
| 09/28/09 |
09/1026 |
10/26/09 |
ABENGOA BIOREFINERY PROJECT, DRAFT EIS, STEVENS COUNTY, KS |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 09/28/09 |
08/1144 |
10/16/09 |
HUBLINE EAST TO WEST PROJECT, NOA FINAL EIS, MA, CT, RI, NJ |
'BIA', 'FWS', 'GS', 'NPS','OSM' |
|
| 09/25/09 |
09/1025 |
11/09/09 |
BASEWIDE UTILITY INFRASTRUCTURE AT MARINE CORPS BASE CAMP PENDLETON, CA {DEIS} |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/25/09 |
09/1024 |
10/26/09 |
PINE MOUNTAIN DAM, GENERAL REEVALUATION REPORT, AR {NOI:EIS} |
FWS, GS, NPS,OSM |
|
| 09/25/09 |
09/1023 |
10/19/09 |
NOI FOR A SUPPLEMENTAL EIS FOR CHANGES TO THE CONSERVATION RESERVE PROGRAM REQUIRED BY THE FOOD, CONSERVATION, AND ENERGY ACT OF 2008 (2008 FARM BILL) |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 09/25/09 |
09/1019 |
10/22/09 |
PROPOSED 278 MEGAWATT CIRCULATING FLUIDIZED BED ELECTRIC GENERATING UNIT AND ASSOCIATED INFRASTRUCTURE, CLARK COUNTY, KY {NOI: SEIS} |
FWS, GS, NPS,OSM |
|
| 09/25/09 |
08/1030 |
10/26/09 |
SAN PEDRO WATERFRONT PROJECT, PORT OF LOS ANGELES, LOS ANGELES COUNTY, CA {FEIS-EIR} |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 09/24/09 |
09/1022 |
10/16/09 |
CARPENTER-REMMEL PROJECT, FERC NO. 271-128, APPLICATION FOR AMENDMENT OF LICENSE, HOT SPRINGS AND GARLAND COUNTIES, AR |
'FWS', 'GS', 'NPS' |
|
| 09/24/09 |
09/1021 |
10/20/09 |
EMPIRE CORRIDOR HIGH SPEED RAIL (HSR) PROGRAM BEGINNING AT PENN STATION, NEW YORK CITY AND COUNTY, AND TERMINATING AT NIAGARA COUNTY, NY [NOI] |
BIA, FWS, GS, NPS |
|
| 09/24/09 |
09/1020 |
11/20/09 |
CALIFORNIA HIGH-SPEED TRAIN PROJECT FROM LOS ANGELES TO SAN DIEGO VIA THE INLAND EMPIRE, CA [NOI] |
BIA, BLM, FWS, GS, NPS |
|
| 09/24/09 |
09/1018 |
11/09/09 |
NOTICE OF AVAILABILITY AND REQUEST FOR COMMENTS ON AN EA FOR QUARANTINE AND INTERSTATE MOVEMENT OF CITRUS GREENING AND ASIAN CITRUS PSYLLID |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/24/09 |
09/1014 |
10/23/09 |
NOI-MODIFICATION OF THE GROTON GENERATION STATION INTERCONNECTION AGREEMENT, BROWN CO, SD |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/24/09 |
09/1013 |
10/26/09 |
NOI FOR THE GILA NATIONAL FOREST TRAVEL MANAGEMENT RULE IMPLEMENTATION, GILA NF, CATRON, GRANT, HIDALGO, AND SIERRA COUNTIES, NM |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/24/09 |
09/1012 |
10/13/09 |
NOI FOR THE KELSEY PEAK TIMBER SALE AND FUEL BREAK PROJECT, SIX RIVERS NF, MAD RIVER RANGER DISTRICT, RUTH, TRINITY COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/24/09 |
09/1011 |
10/16/09 |
NOI FOR THE AMENDED DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION MASTER PLAN AT ST. ELIZABETHS IN SOUTHEAST WASHINGTON, DC |
FWS, GS, NPS |
|
| 09/24/09 |
09/889 |
11/09/09 |
CORRECTED NOI FOR THE FLEA PROJECT(RENAMED CONCOW HAZARDOUS FUELS REDUCTION PROJECT), PLUMAS NF, PLUMAS, SIERRA, AND YUBA COUNTIES, CA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 09/23/09 |
09/1286 |
10/14/09 |
ALASKA RAILROAD CORPORATION CONSTRUCTION OF A RAIL LINE BETWEEN NORTH POLE AND DELTA JUNCTION, AK [FEIS] |
BIA, BLM, FWS, GS, NPS |
|
| 09/23/09 |
09/1017 |
11/09/09 |
DILLON DAM HYDROELECTRIC PROJECT, FERC NO. 13421, APPLICATION FOR PRELIMINARY PERMIT, MUSKINGUM COUNTY, OH |
FWS, GS, NPS |
|
| 09/23/09 |
09/1016 |
11/09/09 |
DEXTER-RUSSELL WATER POWER PROJECT, FERC NO. 13564, APPLICATION FOR PRELIMINARY PERMIT, WORCESTER COUNTY, MA |
FWS, GS, NPS |
|
| 09/23/09 |
09/1015 |
10/14/09 |
RATON 2010 EXPANSION PROJECT, NOTICE OF APPLICATION, HUERFANO, LAS ANIMAS, PUEBLO, AND WELD COUNTIES, COLORADO |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 09/22/09 |
09/998 |
11/09/09 |
DEIS FOR CORPORATE AVERAGE FUEL ECONOMY (CAFE) STANDARDS, PASSENGER CARS AND LIGHT TRUCKS, MODEL YEARS 2012-2016 |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 09/21/09 |
09/1010 |
11/20/09 |
OLD HARBOR HYDROELECTRIC PROJECT, NOI TO FILE APPLICATION, PAD, SD, STUDY REQUESTS, KODIAK ISLAND BOROUGH, AK |
BIA, FWS, GS, NPS,BLM |
|
| 09/21/09 |
09/997 |
11/27/09 |
PROPOSED RULE FOR STANDARDS FOR LIVING ORGANISMS IN SHIPS BALLAST WATER DISCHARGED IN U.S. WATERS |
BIA, FWS, GS, NPS,MMS |
|
| 09/18/09 |
09/1009 |
11/26/09 |
ANAHEIM REGIONAL TRANSPORTATION INTERMODAL CENTER (ARTIC), CITY OF ANAHEIM, ORANGE COUNTY, CA [NOI] |
BIA, BLM, FWS, GS, NPS |
|
| 09/18/09 |
09/1008 |
10/15/09 |
LOUISIANA COASTAL AREA, MODIFICATION OF CAERNARVON PROJECT, LA {NOI: DSEIS} |
FWS, GS, NPS,MMS,OSM |
|
| 09/18/09 |
09/1007 |
10/18/09 |
CHESAPEAKE BAY OYSTER RECOVERY PROJECT, VA AND MD {NOI: PEIS} |
BIA, FWS, GS, NPS,OSM |
|
| 09/18/09 |
09/1006 |
10/15/09 |
PRELIMINARY NOTICE OF TOTAL MAXIMUM DAILY LOAD DEVELOPMENT FOR THE CHESAPEAKE BAY, MD, VA, WV, PA, NY, DE, AND DC |
BIA, FWS, GS, NPS,OSM |
|
| 09/18/09 |
09/416 |
10/16/09 |
PHASE VIII EXPANSION PROJECT, FERC NO. CP09-17-000, NOA FEIS, VARIOUS COUNTIES, ALABAMA AND FLORIDA |
'FWS', 'GS', 'NPS','OSM' |
|
| 09/17/09 |
09/1005 |
10/16/09 |
CARMEN-SMITH HYDROELECTRIC PROJECT, FERC NO. 2242-078, NOA ENVIRONMENTAL ASSESSMENT, LANE AN DLINN COUNTIES, OR |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/17/09 |
09/1004 |
10/16/09 |
DEAD RIVER HYDROELECTRIC PROJECT PROPOSED REPLACEMENT OF THE MCCLURE PENSTOCK, NOA ENVIRONMENTAL ASSESSMENT, MARQUETTE COUNTY, MI |
FWS, GS, NPS |
|
| 09/17/09 |
09/1003 |
10/08/09 |
GULF ISLAND-DEER RIPS HYDROELECTRIC PROJECT, FERC NO. 2283, APPLICATION FOR AMENDMENT OF LICENSE, ANDROSCOGGIN COUNTY, ME |
BIA, FWS, GS, NPS |
|
| 09/17/09 |
09/1002 |
10/07/09 |
INDIAN RIVER PROJECT, FRC NO. 12462, APPLICATION FOR AMENDMENT OF LICENSE, HAMPDEN COUNTY, MA |
FWS, GS, NPS |
|
| 09/17/09 |
09/1001 |
10/16/09 |
CSAH-1 AND TOWER ROAD RECONSTRUCTION, FROM
I-94 TO THE OTTER TAIL RIVER, CITY OF TOWER, OTTER TAIL COUNTY, MN [EAS4F]
|
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/17/09 |
09/1000 |
10/19/09 |
CAPITOL EXPRESSWAY LIGHT RAIL PROJECT EXTENSION, FROM THE EXISTING ALUM ROCK STATION TO EASTRIDGE TRANSIT CENTER, CITY OF SAN JOSE; SANTA CLARA COUNTY, CA [NOI] |
BIA, BLM, FWS, GS, NPS |
|
| 09/17/09 |
09/999 |
09/21/09 |
MEMPHIS REGIONAL INTERMODAL FACILITY (IMF) NEAR ROSSVILLE, FAYETTE COUNTY, TN [INVITATION] |
FWS, GS, NPS |
|
| 09/17/09 |
09/996 |
10/26/09 |
BRAC 05 ACTIONS AT FORT MONROE, VA {DEIS} |
BIA, FWS, GS, NPS,OSM |
|
| 09/17/09 |
09/995 |
10/26/09 |
GROW THE ARMY ACTIONS AT FORT LEWIS AND THE YAKIMA TRAINING CENTER, WA {DEIS} |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 09/17/09 |
09/994 |
10/15/09 |
NATIONAL AMBIENT AIR QUALITY STANDARDS FOR PARTICULATE MATTER {DRAFT DOCUMENTS} |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 09/17/09 |
09/993 |
10/05/09 |
LOUISIANA COASTAL AREA, STABILIZE GULF SHORELINE AT POINT AU FER ISLAND FEASIBILITY STUDY, LA {NOI: DSEIS} |
FWS, GS, NPS,MMS,OSM |
|
| 09/17/09 |
09/992 |
10/05/09 |
LOUISIANA COASTAL AREA, MODIFICATION OF DAVIS POND DIVERSION PROJECT, LA {NOI: DSEIS} |
FWS, GS, NPS,MMS,OSM |
|
| 09/17/09 |
09/991 |
10/05/09 |
LOUISIANA COASTAL AREA, MAINTAIN LANDBRIDGE BETWEEN CAILLOU LAKE AND THE GULF OF MEXICO FEASIBILITY STUDY, LA {NOI: DSEIS} |
FWS, GS, NPS,MMS,OSM |
|
| 09/17/09 |
09/990 |
10/19/09 |
RENEWAL OF AUTHORIZATION TO USE PINECASTLE RANGE, OCALA NATIONAL FOREST, FL {DSEIS} |
BIA, FWS, GS, NPS,MMS |
|
| 09/17/09 |
09/989 |
10/15/09 |
FEDERAL REQUIREMENTS UNDER THE UNDERGROUND INJECTION CONTROL PROGRAM FOR CARBON DIOXIDE, GOELOGIC SEQUESTRATION WELLS {DATA AVAILABILITY} |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 09/17/09 |
09/988 |
09/28/09 |
ASSESSMENT OF ANTICIPATED VISIBILITY IMPROVEMENTS AT SURROUNDING CLASS 1 AREAS AND COST EFFECTIVE OF BEST AVAILABLE RETROFIT TECHMOLOGY FOR FOUR CORNERS POWER PLANT AND NAVAJO GENERATING STATION {ADVANCED NOTICE} |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 09/17/09 |
09/972 |
10/19/09 |
DRAFT PROGRAMMATIC EIS FOR THE STANDARDS FOR LIVING ORGANISMS IN SHIP'S BALLAST WATER DISCHARGED INTO U.S. WATERS |
BIA, FWS, GS, NPS,MMS |
|
| 09/17/09 |
09/970 |
10/26/09 |
DEIS FOR THE FREDS FIRE RESTORATION, ELDORADO NF, PLACERVILLE RANGER DISTRICT, EL DORADO COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/17/09 |
09/931 |
10/26/09 |
CLEVELAND HARBOR, DMMP-EIS, CUYAHOGA COUNTY, OH {EIS} |
FWS, GS, NPS,OSM |
|
| 09/16/09 |
09/987 |
10/16/09 |
GRANT LAKE, FALLS CREEK HYDROELECTRIC PROJECTS, NOI TO FILE APPLICATION, PAD, USE OF TLP, KENAI PENINSULA, AK |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 09/16/09 |
09/986 |
10/07/09 |
C.J. STRIKE HYDROELECTRIC PROJECT, FERC NO. 2055-066, APPLICATION FOR AMENDMENT OF LICENSE (CHANGE IN LAND RIGHTS), OWYHEE AND ELMORE COUNTIES, ID |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/16/09 |
09/985 |
10/07/09 |
COWLITZ RIVER HYDROELECTRIC PROJECT, FERC NO. 2016-207, APPLICATION FOR AMENDMENT OF LICENSE (RECREATIONAL FACILITIES PLAN), LEWIS COUNTY, WA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/16/09 |
09/984 |
10/07/09 |
PROPOSED RULE TO IMPLEMENT DATA COLLECTION FOR TRAWL RATIONALIZATION PROGRAM, PACIFIC COAST GROUNDFISH FMP |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 09/16/09 |
09/983 |
10/16/09 |
KILARC-COW CREEK HYDROELECTRIC PROJECT (SURRENDER OF LICENSE), NOTICE OF SCOPING COMMENTS, MEETINGS, SITE VISIT, SHASTA COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/16/09 |
09/516 |
10/13/09 |
STATIONING AND TRAINING OF INCREASED AVIATION ASSETS WITHIN THE U.S. ARMY, AK {FEIS} |
'BIA', 'BLM', 'FWS', 'GS', 'NPS','OSM' |
|
| 09/16/09 |
09/34 |
10/13/09 |
SWIMMER INTERDICTION SECURITY SYSTEM, NAVAL BASE KITSAP-BANGOR, KITSAP COUNTY, WA {FEIS} |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS','MMS','OSM' |
|
| 09/15/09 |
09/982 |
10/15/09 |
STAGECOACH PROJECT, NOA ENVIRONMENTAL ASSESSMENT, ROUTT COUNTY, CO |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/15/09 |
09/981 |
10/15/09 |
CATAWBA-WATEREE PROJECT, NOA ENVIRONMENTAL ASSESSMENT FOR NON-PROJECT USE OF PROJECT LANDS AND WATERS, ALEXANDER COUNTY, NC |
BIA, FWS, GS, NPS |
|
| 09/15/09 |
09/980 |
11/02/09 |
OCEANLINX MAUI WAVE ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, COUNTY OF MAUI, HI |
'BIA', 'BLM', 'FWS', 'GS', 'NPS','MMS' |
|
| 09/15/09 |
09/979 |
11/02/09 |
MUDDY WATERS HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, JESSAMINE AND MADISON COUNTIES, KY |
FWS, GS, NPS |
|
| 09/15/09 |
09/978 |
11/02/09 |
GODZILLA HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, ANDERSON AND WOODFORD COUNTIES, KY |
FWS, GS, NPS |
|
| 09/15/09 |
09/977 |
11/02/09 |
ENCELADUS HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, LEE COUNTY, KY |
FWS, GS, NPS |
|
| 09/15/09 |
09/976 |
11/02/09 |
GREEN LIGHTNING HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, WAGONER COUNTY, OK |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/15/09 |
09/975 |
11/02/09 |
GRANNY SMITH PROJECT, APPLICATION FOR PRELIMINARY PERMIT, WAGONER COUNTY, OK |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/15/09 |
09/974 |
10/15/09 |
NGL EXTRACTION PROJECT BY FREEPORT LNG DEVELOPMENT, NOI TO PREPARE ENVIRONMENTAL ASSESSMENT, BRAZORIA COUNTY, TX |
FWS, GS, NPS,BLM,OSM |
|
| 09/15/09 |
09/973 |
10/15/09 |
STH-23 IMPROVEMENTS IN FOND DU LAC AND SHEBOYGAN COUNTIES, WI [NOI] |
FWS,NPS |
|
| 09/14/09 |
09/971 |
11/06/09 |
IMPROVEMENTS TO I-15 CORRIDOR AND LOCAL ARTERIAL (PROJECT NEON), CLARK COUNTY, NV -[DES4F] |
BIA, BLM, FWS, GS, NPS |
|
| 09/14/09 |
09/969 |
10/05/09 |
PROPOSED RULE OF 2009-2010 BIENNIAL SPECIFICATIONS AND MANAGEMENT MEASURES FOR CANARY ROCKFISH AND PETRALE SOLE, WA, OR, AND CA |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 09/14/09 |
09/968 |
10/26/09 |
NORTH UNIT DIVERSION DAM PROJECT, APPLICATION FOR PRELIMINARY PERMIT, DESCHUTES COUNTY, OR |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/14/09 |
09/967 |
10/13/09 |
TEMAX AND TIME III PROJECTS, NOA ENVIRONMENTAL ASSESSMENT, OH, PA |
FWS, GS, NPS,OSM |
|
| 09/14/09 |
09/966 |
10/19/09 |
DEIS FOR THE UPPER BEAVER VEGETATION MANAGEMENT PROJECT, PAULINA RANGER DISTRICT, OCHOCO NF, CROOK COUNTY, OR |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/14/09 |
09/965 |
10/26/09 |
DRAFT SUPPLEMENTAL EIS FOR SMALL-SCALE SUCTION DREDGING IN LOLO CREEK AND MOOSE CREEK PROJECT, UPDATED INFORMATION TO ANALYSIS OF THREE ALKTERNATIVES, CLEARWATER NF, NORTH FORK RANGER DISTRICT, CLEARWATER AND IDAHO COUNTIES, ID |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/14/09 |
09/926 |
10/03/09 |
YELLOW LINE EXTENSION PROJECT, FROM DEMPSTER STREET TO OLD ORCHARD ROAD, COOK COUNTY, IL [INVITATION] |
'FWS', 'GS', 'NPS' |
|
| 09/14/09 |
09/925 |
10/03/09 |
RED LINE EXTENSION PROJECT, FROM 95TH STREET ON THE NORTH TO 120TH STREET ON THE SOUTH, COOK COUNTY, IL [INVITATION] |
'FWS', 'GS', 'NPS' |
|
| 09/14/09 |
09/924 |
10/03/09 |
ORANGE LINE EXTENSION PROJECT, MIDWAY STATION AT THE MIDWAY INTERNATIONAL AIRPORT, FROM 59TH STREET TO MARQUETTE ROAD, COOK COUNTY, IL [INVITATION]
|
'FWS', 'GS', 'NPS' |
|
| 09/11/09 |
09/963 |
11/02/09 |
CALIFORNIA HIGH SPEED TRAIN PROJECT FROM PALMDALE TO BAKERSFIELD, CA [NOI] |
BIA, BLM, FWS, GS, NPS |
|
| 09/11/09 |
09/962 |
10/13/09 |
PARK STREET STATION VERTICAL TRANSPORTATION IMPROVEMENTS PROJECT ON THE GREEN LINE IN BOSTON, MA [EA/DE MINIMIS 4F] |
FWS, GS, NPS |
|
| 09/11/09 |
09/961 |
10/26/09 |
IMPROVEMENTS TO CRENSHAW TRANSIT CORRIDOR PROJECT, LOS ANGELES COUNTY, CA [DES POT. 4F] |
BIA, FWS, GS, NPS |
|
| 09/11/09 |
09/386 |
10/05/09 |
FINAL SUPPLEMENTAL WORK PLAN AND FEIS FOR THE LOST RIVER SUBWATERSHED OF THE POTOMAC RIVER WATERSHED, HARDY COUNTY, WV |
'FWS', 'GS', 'NPS','OSM' |
|
| 09/11/09 |
09/358 |
09/28/09 |
SEPTEMBER 2009 FINAL PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT FOR STREAMLINING THE PROCESSING OF EXPERIMENTAL PERMIT APPLICATIONS [FINAL PEIS] |
'BIA', 'BLM', 'FWS', 'GS', 'NPS' |
|
| 09/11/09 |
09/276 |
09/28/09 |
REPLACEMENT OF MAIN STREET BRIDGE OVER THE SOUTHERN RAILROAD AT LOG MILE 0.35 IN BULLS GAP, HAWKINS COUNTY, TN [FINAL 4F] |
'BIA', 'FWS', 'GS', 'NPS' |
|
| 09/11/09 |
08/1123 |
09/01/09 |
THE HARBOR AT TOWER PROJECT, TH-169 AND TH-135 IMPROVEMENTS, CITY OF TOWER, ST. LOUIS COUNTY, MN [FONSI] |
BIA, FWS, GS, NPS |
|
| 09/10/09 |
09/964 |
10/01/09 |
ETC TIGER PIPELINE PROJECT, NOTICE OF APPLICATION, TX, LA |
FWS, GS, NPS,OSM |
|
| 09/10/09 |
09/960 |
10/26/09 |
COON RAPIDS DAM PROJECT, FERC NO. 13457-000 AND 13458-000, APPLICATION FOR COMPETING PRELIMINARY PERMIT, HENNEPIN AND ANOKA COUNTIES, MN |
BIA, FWS, GS, NPS |
|
| 09/09/09 |
09/959 |
10/09/09 |
WARRIOR RIVER PROJECT, NOA ENVIRONMENTAL ASSESSMENT FOR APPLICATION FOR NON-PROJECT USE OF PROJECT LANDS AND WATRES, WINSTON COUNTY, AL |
FWS, GS, NPS |
|
| 09/09/09 |
09/958 |
10/01/09 |
DLLSBORO PROJECT, APPLICATION FOR AMENDMENT OF LICENSE, PROJECT BOUNDARY, JACKSON COUNTY, NC |
BIA, FWS, GS, NPS |
|
| 09/09/09 |
09/957 |
10/23/09 |
ASHUELOT RIVER DAM PROJECT, APPLICATION FOR PRELIMINARY PERMIT, CHESHIRE COUNTY, NH |
FWS, GS, NPS |
|
| 09/09/09 |
09/956 |
10/15/09 |
NOI FOR PROPOSED STEWARDSHIP ACTION TO DEVELOP FACILITIES, INFRASTRUCTURE AND PROGRAMS TO PROVIDE PUBLIC ACCESS TO, AND USE OF, THE VALLES CALDERA NATIONAL PRESERVE FOR RECREATION, EDUCATION, SCIENTIFIC, COMMERCIAL, AND OTHER PURPOSES, SANDOVAL AND RIO ARRIBA COUNTIES, NM |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 09/09/09 |
09/143 |
10/05/09 |
FEIS AND ROD FOR THE INYO NATIONAL FOREST MOTORIZED TRAVEL MANAGEMENT, INYO NF, INYO, MONO, TULARE, FRESNO, MADERA, AND TUOLUMNE COUNTIES, CA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 09/08/09 |
09/955 |
10/01/09 |
BOSTON FELT PROJECT, EXEMPTION REVOCATION BY IMPLIED SURRENDER, SOLICITING COMMENTS, MOTIONS, PROTESTS AND INTERVENTIONS, STRAFFORD COUNTY, NH |
FWS, GS, NPS |
|
| 09/08/09 |
09/954 |
10/23/09 |
GUTTENBERG WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, CLAYTON COUNTY, IA, AND GRANT COUNTY, WI |
BIA, FWS, GS, NPS |
|
| 09/08/09 |
09/953 |
10/23/09 |
CHAMPION RIDGE PUMPED STORAGE HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, JOHNSON COUNTY, WY |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/04/09 |
09/952 |
10/20/09 |
SWEETHEART LAKE PROJECT, APPLICATION FOR PRELIMINARY PERMIT, JUNEAU, AK |
BIA, BLM, FWS, GS, NPS |
|
| 09/04/09 |
09/951 |
10/20/09 |
REDD FOXX HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, WINNEBAGO COUNTY, WI |
BIA, FWS, GS, NPS |
|
| 09/04/09 |
09/950 |
10/20/09 |
WARM SPRINGS HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MALHEUR RIVER, OR |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/04/09 |
09/949 |
10/20/09 |
GEEZER HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, OUTAGAMIE COUNTY, WI |
BIA, FWS, GS, NPS |
|
| 09/04/09 |
09/948 |
10/20/09 |
GRIM REAPER HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, OUTAGAMIE COUNTY, WI |
BIA, FWS, GS, NPS |
|
| 09/04/09 |
09/947 |
10/27/09 |
GIBSON DAM HYDROELECTRIC PROJECT, APPLICATION TENDERED FOR FILING, LEWIS & CLARK AND TETON COUNTIES, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/04/09 |
09/946 |
10/05/09 |
DIAMOND MOUNTAIN COMPRESSOR STATION PROJECT BY WYOMING INTERSTATE COMPANY (WIC), NOI TO PREPARE EA, UINTAH COUNTY, UT |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 09/04/09 |
09/945 |
10/04/09 |
LOST CREEK IN-SITU RECOVERY PROJECT, SWEETWATER CO, WY |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/04/09 |
09/944 |
10/20/09 |
BEAR CREEK HYDROELECTRIC PROJECT, APPLICATIONFOR PRELIMINARY PERMIT, PARK COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/04/09 |
09/943 |
10/20/09 |
PORT FREDERICK TIDAL POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, ICY STRAIT NEAR HOONA, AK |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 09/04/09 |
09/942 |
12/08/09 |
TAKATZ LAKE HYDROELECTRIC PROJECT, SCOPING MEETING, SITE VISIT, SCOPING COMMENTS, CITY OF SITKA, AK |
BIA, BLM, FWS, GS, NPS |
|
| 09/04/09 |
09/941 |
09/15/09 |
PROPOSED RULE MODIFICATION TO THE GULF OF MAINE/GEORGES BANK HERRING MIDWATER TRAWL GEAR AUTHORIZATION, FISHERIES OF NORTHEASTERN U.S. |
BIA, FWS, GS, NPS,MMS |
|
| 09/04/09 |
09/940 |
10/19/09 |
TURNAGAIN ARM TIDAL ELECTRIC GENERATION PROJECT, APPLICATION FOR PRELIMINARY PERMIT, KENAI PENINSULA BOROUGH, ANCHORAGE, AK |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 09/03/09 |
09/939 |
09/25/09 |
NEW CUMBERLAND HYDROELECTRIC PROJECT, SURRENDER OF LICENSE APPLICATION, HANCOCK COUNTY, WV, AND JEFFERSON COUNTY, OH |
FWS, GS, NPS |
|
| 09/03/09 |
09/938 |
10/19/09 |
FRESNO RESERVOIR HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, HILL COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/03/09 |
09/937 |
10/19/09 |
MELVIN PRICE HYDROKINETIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, ST CLAIRE COUNTY, MO, AND MADISON COUNTY, IL |
FWS, GS, NPS,BLM,MMS |
|
| 09/03/09 |
09/936 |
10/01/09 |
HYDRO KENNEBEC PROJECT, APPLICATION FOR TRANSFER OF LICENSE, FERC NO. 2611-071, KENNEBEC AND SOMERSET COUNTIES, ME |
BIA, FWS, GS, NPS |
|
| 09/03/09 |
09/935 |
10/19/09 |
MAHONING CREEK HYDROELECTRIC PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, ARMSTRONG COUNTY, PA |
FWS, GS, NPS |
|
| 09/03/09 |
09/934 |
10/05/09 |
AMENDMENT 10 TO THE ATLANTIC MACKEREL, SQUID, AND BUTTERFISH FMP, PROPOSED RULE TO IMPLEMENT MEASURES, FISHERIES OF THE NORTHEASTERN U.S. |
BIA, FWS, GS, NPS,MMS |
|
| 09/02/09 |
09/933 |
10/13/09 |
NATOMAS LEVEE IMPROVEMENT PROGRAM, PHASE 4a LANDSIDE IMPROVEMENT PROJECT, SUTTER AND SACRAMENTO COUNTIES, CA {DEIS} |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/02/09 |
09/932 |
10/01/09 |
PIT 3, 4 AND 5 HYDRO PROJECT, NOA ENVIRONMENTAL ANALYSIS, SHASTA COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/02/09 |
09/930 |
09/21/09 |
PROPOSED LAKE ON YELLOW CREEK, LAMAR COUNTY, AL {NOI: DEIS} |
BIA, FWS, GS, NPS,OSM |
|
| 09/02/09 |
09/929 |
09/30/09 |
HERBERT HOOVER DIKE MAJOR REHABILITATION PROJECT, PALM BEACH, HENDRY, AND GLADES COUNTIES, FL {NOI: SEIS} |
BIA, FWS, GS, NPS |
|
| 09/02/09 |
09/928 |
09/21/09 |
CONVEYANCE OF FEDERAL LANDS AT LAKE TEXOMA TO THE STATE OF OKLAHOMA, MARSHALL COUNTY, OK {NOI: EIS} |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 09/02/09 |
09/567 |
09/30/09 |
FIXED BASED OPERATOR (FBO) AND ASSOCIATED PROJECTS AT THE CHICAGO EXECUTIVE AIRPORT, WHEELING/PROSPECT HEIGHTS, COOK COUNTY, IL [FINAL EA/4F] |
'FWS', 'GS', 'NPS' |
|
| 09/02/09 |
09/210 |
09/21/09 |
NATOMAS LEVEE IMPROVEMENT PROGRAM, PHASE 3 LANDSIDE IMPROVEMENT PROJECT, CA {FEIS} |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 09/02/09 |
07/482 |
09/21/09 |
REAL PROPERTY MANAGEMENT PLAN (RPMP) AND REAL PROPERTY EXCHANGE (RPX) FOR CAMP PARKS, DUBLIN, CA {FEIS} |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 09/01/09 |
09/927 |
09/22/09 |
TULLOCH PROJECT, FERC NO. 2067-040, APPLICATION FOR AMENDMENT OF LICENSE, SHORELINE MANAGEMENT PLAN, CALAVERAS AND TUOLUMNE COUNTIES, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 09/01/09 |
09/923 |
09/21/09 |
PROPOSED I-405 IMPROVEMENT PROJECT, BETWEEN SR-73 AND I-605, ORANGE COUNTY, CA [NOI AND INVITATION] |
BIA, BLM, FWS, GS, NPS |
|
| 09/01/09 |
09/922 |
10/16/09 |
MUSKINGUM VALLEY HOOVER DAM HYDROELECTRIC PROJECT, FERC NO. 13535-000, APPLICATION FOR PRELIMINARY PERMIT, FRANKLIN COUNTY, OH |
FWS, GS, NPS |
|
| 09/01/09 |
09/921 |
10/01/09 |
NOI FOR MOORE RANCH IN-SITU RECOVERY PROJECT, CAMPBELL CO, WY |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/31/09 |
09/920 |
09/17/09 |
MOBILE BAY LATERAL EXTENSION PROJECT, NOTICE OF APPLICATION, MOBILE COUNTY, ALABAMA |
FWS, GS, NPS,OSM |
|
| 08/31/09 |
09/919 |
09/28/09 |
SOUTH FEATHER POWER PROJECT, NOI TO PREPARE ENVIRONMENTAL DOCUMENT (RAISE DAM CREST AND MODIFY SPILLWAY), BUTTE, PLUMAS, AND YUBA COUNTIES, CALIFORNIA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/31/09 |
09/918 |
09/18/09 |
WALLACE DAM PROJECT, APPLICATION FOR AMENDMENT OF LICENSE, NON-PROJECT USE OF PROJECT LANDS, GREENE COUNTY, GEORGIA |
FWS, GS, NPS |
|
| 08/28/09 |
09/917 |
10/28/09 |
DEIS FOR AN OFF-HIGHWAY VEHICLE MANAGEMENT PLAN, INCLUDING FOREST PLAN AMENDMENT #17, MT. HOOD NF, CLACKAMAS, HOOD RIVER, MULTNOMAH, AND WASCO COUNTIES, OR |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/28/09 |
09/916 |
10/01/09 |
PROPOSED RULEMAKING FOR THE ARMED FORCES RETIREMENT HOME COMPLIANCE WITH THE NEPA |
FWS, GS, NPS |
|
| 08/28/09 |
09/915 |
10/13/09 |
NOI FOR THE CONSTRUCTION OF A NEW LAND PORT OF ENTRY, INTERNATIONAL FALLS, KOOCHICHING COUNTY, MN |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/28/09 |
09/914 |
09/17/09 |
REVIEW OF PROPOSED CHANGES TO SECTION IV OF THE VIRGINIA STATE TECHNICAL GUIDE |
BIA, FWS, GS, NPS,OSM |
|
| 08/28/09 |
09/911 |
09/08/09 |
NOI FOR THE CEDAR-THOM PROJECT, LOLO NF, SUPERIOR RANGER DISTRICT, MINERAL COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/27/09 |
09/913 |
10/02/09 |
NEW JERSEY TRANSIT-PENNSAUKEN JUNCTION TRANSIT CENTER AND PARK AND RIDE, RIVERLINE (LIGHT RAIL) AND ATLANTIC CITY RAIL LINE, CAMDEN COUNTY, NJ [EA] |
FWS,NPS |
|
| 08/27/09 |
09/912 |
10/12/09 |
HETTINGER HYDROELECTRIC PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS FOR SURRENDER OF LICENSE AND CONDUIT EXEMPTION, SOLICITING COMMNNTS, TERMS, CONDITIONS, RECOMMENDATIONS, IDAHO COUNTY, IDAHO |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/27/09 |
09/910 |
09/15/09 |
NOI FOR HOUSING APPROXIMATELY 1,380 LOW-SECURITY, ADULT INMATES THAT ARE PREDOMINANTLY DISTRICT OF COLUMBIA SENTENCED FELONS AND CRIMINAL ALIENS AT A PRIVATELY OWNED INSTITUTION IN WINTON, HERTFORD COUNTY, NC OR PRINCESS ANNE, SOMERSET COUNTY, MD |
FWS, GS, NPS |
|
| 08/27/09 |
09/909 |
10/09/09 |
2-MEGAWATT GREEN HYDROPOWER ROCKY REACH PROJECT, FERC NO. 13534, DOUGLAS AND CHELAN COUNTIES, WASHINGTON |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/27/09 |
09/908 |
10/09/09 |
SWIFT RIVER MILL HYDROELECTRIC PROJECT, FERC NO. 12662-001, WASHINGTON COUNTY, RHODE ISLAND |
FWS, GS, NPS |
|
| 08/27/09 |
09/907 |
09/25/09 |
MINER SHOAL WATERPOWER PROJECT, FERC NO. 12492-001, NOTICE OF SOLICITING SCOPIGCOMMENTS, HABERSHAM COUNTY, GEORGIA |
FWS, GS, NPS |
|
| 08/27/09 |
08/1277 |
09/14/09 |
PROPOSED NEW 20TH STREET SE CONNECTION CONSTRUCTION BETWEEN MARION ROAD (CSAH 36) AND 11TH AVENUE (CSAH 1), CITY OF ROCHESTER, OLMSTED COUNTY, MN [FINAL 4F] |
'BIA', 'FWS', 'GS', 'NPS' |
|
| 08/26/09 |
08/428 |
09/21/09 |
IMPROVEMENTS TO THE LAKE OSWEGO TO PORTLAND TRANSIT PROJECT IN THE PORTLAND METROPOLITAN AREA; CLACKAMAS AND MULTNOMAH COUNTIES, OR [INVITATION TO PARTICIPATE] |
'BIA', 'BLM', 'FWS', 'GS', 'NPS' |
|
| 08/25/09 |
09/906 |
10/20/09 |
NOTICE OF AVAILABILITY AND REQUEST FOR COMMENTS ON THE NATIONAL AQUATIC ANIMAL HEALTH PLAN FOR THE UNITED STATES |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/21/09 |
09/905 |
09/21/09 |
TRICOR TEN SECTION STORAGE PROJECT, NOI TO PREPARE EA, KERN COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 08/21/09 |
09/904 |
09/28/09 |
BISON PIPELINE PROJECT, NOTICE OF AVAILABILITY OF DRAFT ENVIRONMENTAL IMPACT STATEMENT, WYOMING, MONTANA, AND NORTH DAKOTA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS','OSM' |
|
| 08/21/09 |
09/903 |
10/06/09 |
HIGHGATE FALLS PROJECT, APPLICATION ACCEPTED FOR FILING, SOLICITING MOTIONS TO INTERVENE, PROTESTS, COMMENTS, TERMS, CONDITIONS, AND PRESCRIPTIONS, FRANKLIN COUNTY, VERMONT |
FWS, GS, NPS |
|
| 08/21/09 |
09/902 |
09/21/09 |
SOUTH SLOPE PUMPED STORAGE PROJECT, NOI TO FILE APPLITAION, PAD, USE OF TLP, FREMONT COUNTY, CO |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/21/09 |
09/901 |
10/05/09 |
LAKE VALLEY CANAL (REFERRED TO AS PARSHALL CANAL) PROJECT, APPLICATION FOR COMPETING PRELIMINARY PERMIT, PLACER COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/21/09 |
09/900 |
10/05/09 |
IGIUGIG RISEC WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, KOVICHAK RIVER IN THE LAKE AND PENINSULA BOROUGH, AK |
BIA, BLM, FWS, GS, NPS |
|
| 08/21/09 |
09/899 |
10/05/09 |
WAX LAKE OUTLET PROJECT, APPLICATION FOR PRELIMINARY PERMIT, ST. MARY PARISH, LOUISIANA |
FWS, GS, NPS |
|
| 08/21/09 |
09/248 |
09/11/09 |
I-35 RECONSTRUCTION FROM WARREN/POLK COUNTY LINE TO IOWA HIGHWAY 2 IN WARREN COUNTY, IA [FONSI] |
BIA, FWS, GS, NPS |
|
| 08/21/09 |
09/86 |
10/07/09 |
EAST CORRIDOR PROJECT, FROM DOWNTOWN DENVER TO DENVER INTERNATIONAL AIRPORT IN AURORA, ADAMS COUNTY, CO [FEIS/4F] |
'BIA', 'BLM', 'FWS', 'GS', 'NPS' |
|
| 08/21/09 |
08/1214 |
09/28/09 |
IMPROVEMENTS TO GENEVA ROAD, CENTER STREET 1600 WEST (PROVO) TO GENEVA ROAD SR-89 (PLEASANT GROVE), UTAH COUNTY, UT [FEIS4F] |
'BIA', 'BLM', 'FWS', 'GS', 'NPS' |
|
| 08/20/09 |
09/898 |
10/05/09 |
TACONY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, PHILADELPHIA COUNTY, NORTH CAROLINA |
FWS, GS, NPS |
|
| 08/20/09 |
09/897 |
09/11/09 |
CATAWBA-WATEREE PROJECT, APPLICATION FOR AMENDMENT OF LICENSE, NON-PROJECT USE OF PROJECTS LANDS AND WATERS, MECKLENBURG COUNTY, NC |
BIA, FWS, GS, NPS |
|
| 08/20/09 |
09/896 |
10/28/09 |
DRAFT SUPPLEMENTAL EIS TO ACCOMPANY THE 2007 LAND AND RESOURCE MANAGEMENT PLAN AND FEIS FOR THE ALLEGHENY NF, ELK, FOREST, McKEAN, AND WARREN COUNTIES, PA |
FWS, GS, NPS,OSM |
|
| 08/20/09 |
09/703 |
09/15/09 |
US-281, FROM LOOP 1604 TO BORGFELD ROAD, BEXAR COUNTY, TX [INVITATION TO PARTICIPATE] |
'FWS', 'GS', 'NPS' |
|
| 08/19/09 |
09/895 |
10/05/09 |
DEIS FOR THE WILLOW CREEK PASS FUEL REDUCTION PROJECT, HAHNS PEAK-BEARS EARS RANGER DISTRICT, MEDICINE BOW-ROUTT NFs, ROUTT COUNTY, CO |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 08/19/09 |
09/894 |
09/28/09 |
DEIS FOR THE HERMOSA-MITCHELL LAKES LAND EXCHANGE, COLUMBINE RANGER DISTRICT, SAN JUAN NF, LA PLATA AND SAN JUAN COUNTIES, CO |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 08/18/09 |
09/893 |
09/18/09 |
US-219, SPRINGVILLE TO SALAMANCA, SR-39 TO
SR-17 (I-86), ERIE AND CATTARAUGUS COUNTIES, NY [NOI]
|
BIA, FWS, GS, NPS |
|
| 08/18/09 |
09/892 |
09/02/09 |
LOWER BAKER MILL, AMERICAN TISSUE DAM, UPPER BAKER, LOWELL TANNERY, EUSTIS, BURNHAM, MARCAL, DAMARISCOTTA PROJECT, APPLICATION FOR TRANSFER OF LICENSE, MAINE |
BIA, FWS, GS, NPS |
|
| 08/18/09 |
09/891 |
10/02/09 |
HENRY M JACKSON HYDROELECTRIC PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, SNOHOMISH COUNTY, WASHINGTON |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/18/09 |
09/890 |
09/18/09 |
RECONSTRUCTION OF NH 110, CITY OF BERLIN, COOS COUNTY, NH [EA/4F] |
FWS, GS, NPS |
|
| 08/18/09 |
09/887 |
09/21/09 |
PROGRAMMATIC DEIS FOR THE BIOMASS CROP ASSISTANCE PROGRAM |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 08/17/09 |
09/888 |
10/19/09 |
MARKLAND HYDROELECTRIC PROJECT, NOTICE OF SCOPING MEETINGS, SITE VISIT, AND SOLICITING SCOPING COMMENTS, SWITZERLAND COUNTY, INDIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/886 |
09/18/09 |
NOI FOR ANTELOPE AND JAB URANIUM PROJECT LOCATED IN SWEETWATER CO, WY |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/17/09 |
09/885 |
09/29/09 |
STOUTS PASS HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT MARY PARISH, LOUISIANA |
FWS, GS, NPS,MMS |
|
| 08/17/09 |
09/884 |
09/29/09 |
TIGER ISLAND HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT MARTIN PARISH, LOUISIANA |
FWS, GS, NPS,MMS |
|
| 08/17/09 |
09/883 |
09/29/09 |
SOUTH MYETTE POINT HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT MARY PARISH, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/882 |
09/29/09 |
MYETTE POINT HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT MARTIN, AND SAINT MARY PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/881 |
09/29/09 |
TURKEY ISLAND HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT MARTIN, AND IBERIA PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/880 |
09/29/09 |
LAKE CHICOT HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT MARTIN, AND IBERIA PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/879 |
09/29/09 |
DEADMAN COVE HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT MARTIN PARISH, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/878 |
09/29/09 |
LAKE MONGOULOIS HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT MARTIN PARISH, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/877 |
09/29/09 |
TENSAS HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT MARTIN, AND IBERVILLE PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/876 |
09/29/09 |
WHISKEY BAY HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT LANDRY, SAINT MARTIN, AND IBERVILLE PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/875 |
09/29/09 |
HAPPYTOWN HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, SAINT LANDRY, AND SAINT MARTIN PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/874 |
09/29/09 |
KROTZ SPRINGS HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, POINTE COUPE, SAINT LANDRY, AND SAINT MARTIN PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/873 |
09/29/09 |
BAYOU LATENACHE HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, POINTE COUPE, AND SAINT LANDRY PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/872 |
09/29/09 |
MELVILLE CREVASSE HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, POINTE COUPE, AND SAINT LANDRY PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/871 |
09/29/09 |
CYPRESS POINT HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, AVOYELLES, POINTE COUPE, AND SAINT LANDRY PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/870 |
09/29/09 |
SIMMESPORT HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, AVOYELLES, AND POINTE COUPE PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/869 |
09/29/09 |
TURNBULL ISLAND HYDROKINETIC ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, AVOYELLES, WEST FELICIANA, AND POINTE COUPE PARISHES, LOUISIANA |
FWS, GS, NPS |
|
| 08/17/09 |
09/868 |
09/29/09 |
JACKSON MEADOWS DAM PROJECT, APPLICATION FOR PRELIMINARY PERMIT, NEVADA COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/17/09 |
09/867 |
09/14/09 |
SHORELINE MANAGEMENT PALN (SMP) FOR THE PENSACOLA HYDROELECTRIC PROJECT, NOA ENVIRONMENTAL ASSESSMENT, CRAIG, DELAWARE, MAYES, AND OTTAWA COUNTIES, OK |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/17/09 |
09/866 |
09/14/09 |
TIETON DAM PROJECT, APPLICATION FOR TRANSFER OF LICENSE, YAKIMA COUNTY, WASHINGTON |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/17/09 |
09/865 |
09/14/09 |
ALDER BROOK MINI HYDRO PEOJECT, APPLICATION TENDERED FOR FILING, STUDY REQUESTS, FRANKLIN COUNTY, VERMONT |
FWS, GS, NPS |
|
| 08/17/09 |
09/864 |
09/04/09 |
MALLISON FALLS PROJECT, APPLICATION FOR AMENDMENT OF LICENSE, CUMBERLAND COUNTY, MAINE |
BIA, FWS, GS, NPS |
|
| 08/17/09 |
09/863 |
09/04/09 |
CULINARY WATER SYSTEM HYDROLELECTRIC PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, LINCOLN COUNTY, WYOMING |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/17/09 |
09/434 |
09/14/09 |
REAUTHORIZATION OF DREDGED MATERIAL MANAGEMENT PROGRAM DISPOSAL SITE, COMMENCEMENT BAY, WA {FSEIS} |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS','OSM' |
|
| 08/14/09 |
09/862 |
09/01/62 |
SHELBY AVENUE/DEMONBREUM STREET (GATEWAY BOULEVARD) CORRIDOR, NASHVILLE, TN DAVIDSON COUNTY, TN [SDEIS] |
FWS, GS, NPS |
|
| 08/14/09 |
09/861 |
10/05/09 |
KENOSHA-RACINE-MILWAUKEE (KRM) CORRIDOR, LOCATED IN KRM COUNTIES, WI [DES/POT. 4F] |
BIA, FWS, GS, NPS |
|
| 08/14/09 |
09/860 |
10/09/09 |
GOVERNOR HARRY W. NICE MEMORIAL BRIDGE IMPROVEMENT PROJECT, CHARLES COUNTY, MD; AND KING GEORGE COUNTY, VA [EAS/4F] |
FWS, GS, NPS |
|
| 08/14/09 |
09/859 |
09/14/09 |
NOTICE OF AVAILABILITY AND REQUEST FOR COMMENTS ON THE REVISED MANAGEMENT PLAN FOR THE JACQUES COUSTEAU NATIONAL ESTUARINE RESEARCH RESERVE, ATLANTIC, BURLINGTON, AND OCEAN COUNTIES, NEW JERSEY |
FWS, GS, NPS |
|
| 08/14/09 |
09/858 |
09/10/09 |
NOI FOR THE FOREST-WIDE SITE-SPECIFIC INVASIVE PLANT MANAGEMENT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/14/09 |
09/438 |
08/28/09 |
COLUMBUS CROSSROADS I-70/I-71 SOUTH INNERBELT STUDY, FRANKLIN COUNTY, OH [FINAL 4F] |
'FWS', 'GS', 'NPS' |
|
| 08/13/09 |
09/857 |
09/04/09 |
LAKE CHELAN HYDROLELECTRIC PROJECT, APPLICATION FOR AMENDMENT OF LICENSE, CHELAN COUNTY, WASHINGTON |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/13/09 |
09/856 |
09/25/09 |
FALLS LAKE DAM HYDROELECTRIC PROJECT, NOTICE OF APPLICATION FOR PRELIMINARY PERMIT, WAKE COUNTY, NORTH CAROLINA |
BIA, FWS, GS, NPS |
|
| 08/13/09 |
09/855 |
09/02/09 |
FREEPORT LNG DEVELOPMENT, FREEPORT LNG EXPANSION PROJECTS, NOTICE OF APPLICATION FILING, BRAZORIA COUNTY, TEXAS |
FWS, GS, NPS,OSM |
|
| 08/13/09 |
09/854 |
09/10/09 |
NEW ORLEANS TO VENICE FEDERAL HURRICANE PROTECTION LEVEE, PLAQUEMINES PARISH, LA {NOI: SEIS} |
FWS, GS, NPS,OSM |
|
| 08/13/09 |
09/853 |
09/09/09 |
SINGLE NUCLEAR UNIT AT THE BELLEFONTE SITE, JACKSON COUNTY, ALABAMA {NOI: SEIS} |
BIA, FWS, GS, NPS,OSM |
|
| 08/12/09 |
09/852 |
09/05/09 |
VIRGINIA BEACH TRANSIT EXTENSION STUDY, VA [INVITATION TO BECOME PARTICIPATING AGENCY] |
FWS, GS, NPS |
|
| 08/12/09 |
09/851 |
09/11/09 |
Rehabilitation and Reuse of Minnesotas Union Depot as a Multi-Modal Transit Hub, City of St. Paul, Ramsey County, Minnesota [EAS4f] |
FWS, GS, NPS,BIA |
|
| 08/12/09 |
09/848 |
09/21/09 |
MODIFICATION OF THE CONDOR 1 AND CONDOR 2 MILITARY OPERATION AREAS, 104TH FIGHTER WING, MA AIR NATIONAL GUARD, ME AND NH {DEIS} |
BIA, FWS, GS, NPS |
|
| 08/12/09 |
08/979 |
09/10/09 |
PROPOSED CENTENNIAL CORRIDOR HIGHWAY PROJECT EXTENDING FROM SR-58 TO I-5 , KERN COUNTY, CA [INVITATION] |
'BIA', 'BLM', 'FWS', 'GS', 'NPS' |
|
| 08/12/09 |
08/713 |
09/21/09 |
GOLD LINE CORRIDOR PROJECT, DENVER, ADAMS, AND JEFFERSON COUNTIES, CO [FEIS] |
BIA, BLM, FWS, GS, NPS |
|
| 08/11/09 |
09/510 |
09/08/09 |
FEIS FOR THE SAN YSIDRO LAND PORT OF ENTRY IMPROVEMENTS PROJECT, SAN YSIDRO, SAN DIEGO COUNTY, CA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 08/10/09 |
09/850 |
08/31/09 |
DIAMOND MOUNTAIN COMPRESSOR STATION PROJECT BY WYOMING INTERSTATE COMPANY (WIC), NOTICE OF APPLICATION FILING, UINTAH COUNTY, UTAH |
BIA, BLM, BOR, FWS, GS, NPS,OSM |
|
| 08/10/09 |
09/849 |
09/21/09 |
DEIS FOR THE BITTERROOT NF TRAVEL MANAGEMENT PLANNING PROJECT, RAVALLI COUNTY, MT |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/10/09 |
09/847 |
09/29/09 |
SALUDA HYDROELECTRIC PROJECT, SETTLEMENT AGREEMENT AND SOLICITING COMMENTS, RICHLAND, LEXINGTON, SALUDA, AND NEWBERRY COUNTIES, SC |
FWS, GS, NPS |
|
| 08/10/09 |
09/846 |
09/22/09 |
KAPLAN HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, CASS AND BROWN COUNTIES, ILLINOIS |
FWS, GS, NPS |
|
| 08/10/09 |
09/845 |
09/22/09 |
SUPER PANDA HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, ALLEGHENY COUNTY, PENNSYLVANIA |
FWS, GS, NPS |
|
| 08/10/09 |
09/844 |
09/22/09 |
MEAN GREEN HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, JACKSON COUNTY, IOWA, AND JO DAVIES COUNTY, ILLINOIS |
'FWS', 'GS', 'NPS' |
|
| 08/10/09 |
09/843 |
09/22/09 |
GREEN THUNDER HYDROELECTRIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, BALLARD COUNTY, KENTUCKY, AND PULASKI COUNTY, OHIO |
'FWS', 'GS', 'NPS' |
|
| 08/10/09 |
09/842 |
09/22/09 |
WILLOW ISLAND HYDROKINETIC PROJECT, WASHINGTON COUNTY, OHIO, AND PLEASANTS COUNTY, WEST VIRGINIA |
FWS, GS, NPS,MMS |
|
| 08/10/09 |
09/841 |
09/22/09 |
RACINE HYDROKINETIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MEIGS COUNTY, OHIO, AND MASON COUNTY, WEST VIRGINIA |
FWS, GS, NPS,MMS |
|
| 08/10/09 |
09/840 |
09/22/09 |
BELLEVILLE HYDROKENITIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MEIGS COUNTY, OHIO, AND WOOD COUNTY, WEST VIRGINIA |
FWS, GS, NPS,MMS |
|
| 08/07/09 |
09/839 |
09/08/09 |
OCEAN RENEWABLE POWER COMPANY (ORPC) EASTPORT TIDAL ENERGY PROJECT, NOI TO FILE HYDROKINETIC PILOT PROJECT LICENSE APPLICATION, WAIVER OF ILP, WASHINGTON COUNTY, MAINE |
BIA, FWS, GS, NPS,MMS |
|
| 08/07/09 |
09/838 |
09/04/09 |
IMPLEMENTATION OF THE BASE REALIGNMENT AND CLOSURE (BRAC) 2005 DECISIONS AND RELATED ACTIONS AT EGLIN AIR FORCE BASE, FL (NOI: SEIS} |
BIA, FWS, GS, NPS |
|
| 08/07/09 |
09/328 |
09/01/09 |
SMITH MOUNTAIN PUMPED STORAGE PROJECT, FEIS, FERC NO. 2210-169, BEDFORD, CAMPBELL, FRANKLIN AND PITTSYLVANIA COUNTIES, VA |
'BIA', 'FWS', 'GS', 'NPS' |
|
| 08/07/09 |
08/851 |
09/08/09 |
MOUNTAIN RESERVOIRS LAND MANAGEMENT PLAN, GA, NC, AND TN {FEIS} |
'FWS', 'GS', 'NPS','OSM' |
|
| 08/06/09 |
09/837 |
09/09/00 |
I-93 IMPROVEMENTS, SALEM TO MANCHESTER; HILLSBOROUGH AND ROCKINGHAM COUNTIES, NH [SDEIS/4F] |
FWS, GS, NPS |
|
| 08/06/09 |
09/836 |
08/27/09 |
NATURAL GAS PIPELINE COMPANY OF AMERICA PROJECT, NOTICE OF APPLICATION, PANOLA COUNTY, TEXAS |
FWS, GS, NPS,OSM |
|
| 08/06/09 |
09/835 |
09/21/09 |
ZANESVILLE LOCK AND DAM WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MUSKINGUM COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/834 |
09/21/09 |
ROKEBY LOCK AND DAM WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MORGAN COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/833 |
09/21/09 |
ELLIS LOCK AND DAM WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MUSKINGUM COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/832 |
09/21/09 |
JULIAN GRIGGS WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, FRANKLIN COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/831 |
09/21/09 |
PHILO LOCK AND DAM WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MUSKINGUM COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/830 |
09/21/09 |
LOWELL LOCK AND DAM WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, WASHINGTON COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/829 |
09/21/09 |
MALTA LOCK AND DAM WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, MORGAN COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/828 |
09/21/09 |
DEVOLA LOCK AND DAM WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, WASHINGTON COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/827 |
09/21/09 |
BEVERLY LOCK AND DAM WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, WASHINGTON COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/826 |
09/21/09 |
LUKE'S CHUTE LOCK AND DAM WATER POWER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, WASHINGTON COUNTY, OHIO |
FWS, GS, NPS |
|
| 08/06/09 |
09/825 |
09/01/09 |
SUBSISTENCE FISHING FOR PACIFIC HALIBUT FISHERIES IN WATERS IN AND OFF ALASKA, PROPOSED RULE |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 08/06/09 |
09/824 |
10/13/09 |
REVIEW OF STANDARD REVIEW PLANS FOR ENVIRONMENTAL REVIEW OF NUCLEAR POWER PLANTS, SUPPLEMENT 1, REVISION 1, NUREG-1555 |
BIA, BLM, BOR, FWS, GS, NPS,MMS |
|
| 08/06/09 |
09/823 |
09/06/09 |
SEIS FOR URANERZ ENERGY CORPORATION'S IN-SITU RECOVERY PROJECT, CAMPBELL AND JOHNSON COS, WY |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/06/09 |
07/542 |
08/21/09 |
I-65 TO US-31W ACCESS IMPROVEMENT, WARREN COUNTY, KY [FEIS] |
FWS, GS, NPS |
|
| 08/05/09 |
09/822 |
09/04/09 |
ELLSWORTH, MEDWAY, MILFORD, ORONO, AND STILLWATER PROJECTS, TRANSFER OF LICENSE FROM PPL MAINE, LLC, TO BLACK BEAR HYDRO PARTNERS, LLC, HANCOCK AND PENOBSCOT COUNTIES, MAINE |
BIA, FWS, GS, NPS |
|
| 08/05/09 |
09/821 |
08/26/09 |
TENNESSEE GAS PIPELINE COMPANY'S NOTICE OF APPLICATION TO ABANDON INACTIVE SUPPLY PIPELINES IN FEDERAL OFFSHORE WATERS AND IN STATE WATERS, PLAQUEMINES PARISH, LOUISIANA |
'FWS', 'GS', 'NPS','MMS','OSM' |
|
| 08/05/09 |
09/820 |
09/29/09 |
STUYVESANT FALLS HYDRO PROJECT, FERC NO. 2696-033, APPLICATION TENDERED FOR FILING AND SOLICITING ADDITIONAL STUDY REQUESTS, COLUMBIA COUNTY, NEW YORK |
BIA, FWS, GS, NPS |
|
| 08/05/09 |
09/819 |
09/04/09 |
PROPOSED RULE TO ADJUST THE NORTH AND SOUTH ATLANTIC SWORDFISH QUOTAS FOR 2009, ATLANTIC HIGHLY MIGRATORY SPECIES |
BIA, FWS, GS, NPS,MMS |
|
| 08/05/09 |
09/818 |
09/04/09 |
NOI TO PREPARE EIS FOR THE SPINY DOGFISH FISHERY MANAGEMENT PLAN AMENDMENT 3 |
BIA, FWS, GS, NPS,MMS |
|
| 08/04/09 |
09/817 |
09/03/09 |
VEAZIE, GREAT WORKS, AND HOLLAND HYDROELECTRIC PROJECT, NOA DRAFT ENVIRONMENTAL ASSESSMENT, PENOBSCOT COUNTY, MAINE |
BIA, FWS, GS, NPS |
|
| 08/04/09 |
09/816 |
09/20/09 |
INGLIS HYDROELECTRIC PROJECT, APPLICATION TENDERED FOR FILING AND SOLICITING ADDITIONAL STUDY REQUESTS, LEVY COUNTY, FLORIDA |
BIA, FWS, GS, NPS |
|
| 08/04/09 |
09/815 |
09/18/09 |
MAHONING CREEK HYDROELECTRIC PROJECT, APPLICATION TENDERED FOR FILING, ESTABLISHING PROCEDURAL SCHEDULE, DEADLINE FOR FINAL AMENDMENTS, ARMSTRONG COUNTY, PENNSYLVANIA |
FWS, GS, NPS |
|
| 08/04/09 |
09/813 |
09/28/09 |
APRA HARBOR, PROPOSED SITE DESIGNATION OF AN OCEAN DREDGED MATERIAL DISPOSAL SITE OFFSHORE, GUAM {DEIS} |
FWS, GS, NPS,MMS |
|
| 08/04/09 |
09/812 |
08/27/09 |
REACH 1B, 1C, AND 1D ON THE HERBERT HOOVER DIKE MAJOR REHABILITATION PROJECT, MARTIN AND PALM BEACH COUNTIES, FL {NOI: SEIS} |
BIA, FWS, GS, NPS |
|
| 08/04/09 |
09/367 |
08/31/09 |
FINAL SUPPLEMENTAL EIS FOR THE PROPOSED UPDATE TO THE MASTER PLAN FOR THE FDA HEADQUARTERS CONSOLIDATION AT FEDERAL RESEARCH CENTER AT WHITE OAK IN SILVER SPRING, MONTGOMERY COUNTY, MD |
'FWS', 'GS', 'NPS' |
|
| 08/03/09 |
09/811 |
09/08/09 |
DOMINION HUB III PROJECT, NOA ENVIRONMENTAL ASSESSMENT, GREENE COUNTY, PENNSYLVANIA, AND WETZEL COUNTY, WEST VIRGINIA |
FWS, GS, NPS,OSM |
|
| 08/03/09 |
09/810 |
08/31/09 |
DOMINION HUB II PROJECT, NOA ENVIRONMENTAL ASSESSMENT, TOMPKINS COUNTY, NEW YORK |
BIA, FWS, GS, NPS,OSM |
|
| 08/03/09 |
09/809 |
09/14/09 |
FLANNAGAN HYDROELECTRIC PROJECT, APPLICATION TENDERED FOR FILING, STUDY REQUESTS, DICKENSON COUNTY, VIRGINIA |
BIA, FWS, GS, NPS |
|
| 08/03/09 |
09/808 |
09/15/09 |
SALUDA HYDROELECTRIC PROJECT, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, SOLICITING COMMENTS, RECOMMENDATIONS, TERMS, CONDITIONS AND PRESCRIPTIONS, RICHLAND, LEXINGTON, SALUDA, AND NEWBERRY COUNTIES, SOUTH CAROLINA |
FWS, GS, NPS |
|
| 08/03/09 |
09/807 |
09/14/09 |
LAKE CREEK HYDRO PROJECT, FERC NO. 2594-013, LINCOLN COUNTY, MONTANA, APPLICATION READY FOR ENVIRONMENTAL ANALYSIS, SOLICITING COMMENTS, RECOMMNEDATIONS, TERMS AND CONDITION, AND FISHWAY PRESCRIPTIONS |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 08/03/09 |
09/805 |
09/17/09 |
REPLACEMENT OF WEST BROOK ROAD BRIDGE OVER WANAQUE RESERVOIR, BOROUGHS OF RINGWOOD AND WANAQUE; PASSAIC COUNTY, NJ [4F] |
'FWS', 'GS', 'NPS' |
|
| 07/31/09 |
09/806 |
08/31/09 |
IMPROVEMENTS TO LOOP 1604, FROM FM 1957 TO IH 35 NORTH, BEXAR COUNTY, TX [NOI] |
FWS, GS, NPS |
|
| 07/31/09 |
07/440 |
08/31/09 |
MATAGORDA SHIP CHANNEL IMPROVEMENT PROJECT, CALHOUN AND MATAGORDA COUNTIES, TX {FEIS} |
'FWS', 'GS', 'NPS','BOR','MMS','OSM' |
|
| 07/30/09 |
09/804 |
08/20/09 |
TENESSEE GAS PIPELINE COMPANY EXISTING 300 LINE SYSTEM PROJECT, NOTICE OF APPLICATION, PENNSYLVANIA AND NEW JERSEY |
FWS, GS, NPS,OSM |
|
| 07/30/09 |
09/803 |
09/28/09 |
MARKLAND HYDROELECTRIC PROJECT, APPLICATION NREA ACCEPTED FOR FILING AND SOLICITING MOTIONS TO INTERVENE AND PROTESTS, SWITZERLAND COUNTY, INDIANA |
FWS, GS, NPS |
|
| 07/30/09 |
09/802 |
09/14/09 |
DEIS FOR TRAVEL PLANNING, CLEARWATER NF, IDAHO, CLEARWATER, LATAH, AND SHOSHONE COUNTIES, ID |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 07/30/09 |
09/801 |
09/14/09 |
DEIS FOR THE BRIDGEPORT TRAVEL MANAGEMENT PROJECT, BRIDGEPORT RANGER DISTRICT, HUMBOLDT-TOIYABE NF, LYON,DOUGLAS, AND MINERAL COUNTIES, NV AND MONO COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 07/30/09 |
09/800 |
09/15/09 |
NOI FOR REINTRODUCTION OF COHO SALMON IN THE MID-COLUMBIA RIVER, CHELAN AND OKANOGAN COS, WA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 07/30/09 |
09/799 |
08/31/09 |
ANPR OF SKATE BAIT CONTROL DATE, SKATE COMPLEX FISHERY, NORTHEAST SKATE FMP, FISHERIES OF THE NORTHEASTERN UNITED STATES |
BIA, FWS, GS, NPS,MMS |
|
| 07/30/09 |
09/492 |
08/31/09 |
FEIS FOR THE ADVANCED TECHNOLOGY SOLAR TELESCOPE, HALEAKALA, MAUI, HI |
'FWS', 'GS', 'NPS' |
|
| 07/30/09 |
09/286 |
08/18/09 |
CLEVELAND INNERBELT PROJECT, CITY OF CLEVELAND, CUYAHOGA COUNTY, OH [FEIS] |
'FWS', 'GS', 'NPS' |
|
| 07/29/09 |
09/798 |
09/11/09 |
MARMET HYDROKINETIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, KANAWHA COUNTY, WEST VIRGINIA |
FWS, GS, NPS,MMS |
|
| 07/29/09 |
09/797 |
09/11/09 |
WINFIELD HYDROKINETIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, PUTNAM COUNTY, WEST VIRGINIA |
FWS, GS, NPS,MMS |
|
| 07/29/09 |
09/796 |
09/11/09 |
MELDAHL HYDROKINETIC PROJECT, APPLICATION FOR PRELIMINARY PERMIT, CLERMONT COUNTY, OHIO, AND BRACKEN COUNTY, KENTUCKY |
FWS, GS, NPS,MMS |
|
| 07/29/09 |
09/795 |
09/11/09 |
MCCLOUD-PIT HYDROELECTRIC PROJECT, APPLICATION TENDERED FOR FILING, PROCEDURAL SCHEDULE, FINAL AMENDMENTS, SHASTA COUNTY, CALIFORNIA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 07/29/09 |
09/794 |
08/08/09 |
NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED MEP AMENDMENT AND EXPANSION PROJECTS, LAMAR AND CASS COUNTIES, TEXAS, UNION PARISH, LOUISIANA, AND HINDS COUNTY, MISSISSIPPI |
FWS, GS, NPS,BLM,OSM |
|
| 07/29/09 |
09/793 |
08/24/09 |
NEW SOURCE REVIEW PROGRAM FOR PARTICULATE MATTER LESS THAN 2.5 MICROMETERS - PROPOSAL TO EXTEND ADMINISTRATIVE STAY {RULEMAKING} |
BIA, BLM, BOR, FWS, GS, NPS,MMS,OSM |
|
| 07/29/09 |
09/792 |
10/12/09 |
PROPOSED RULE FOR KILLER WHALES IN THE NORTWEST REGION UNDER ESA AND MMPA, WASHINGTON STATE |
BIA, BLM, FWS, GS, NPS,MMS |
|
| 07/29/09 |
09/791 |
09/28/09 |
NOTICE OF FINDING ON A PETITION TO LIST THE LARGETOOTH SAWFISH AS AN ENDANGRED OR THRETENED UNDER ESA |
BIA, FWS, GS, NPS,MMS |
|
| 07/29/09 |
08/958 |
08/24/09 |
FEIS AND ROD FOR THE FARLEY VEGETATION MANAGEMENT PROJECT, NORTH FORK JOHN DAY RANGER DISTRICT, UMATILLA NF, GRANT COUNTY, OR |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
| 07/28/09 |
09/790 |
09/11/09 |
MURPHY DAM PROJECT, APPLICATIONS FOR COMPETING PRELIMINARY PERMIT BY CONSOLIDATED (13393), VILLAGE OF SWANTON (13422), AND TRANSCANADA HYDRO (13425), COOS COUNTY, NEW HAMPSHIRE |
FWS, GS, NPS |
|
| 07/28/09 |
09/789 |
08/30/09 |
BLUE BRIDGE PIPELINE PROJECT, NOI TO PREPARE AN EIS AND LAND AND RESOURC MANAGEMENT PLAN AMENDMENT, BENTON, KLICKITAT, SKAMANIA, AND CLARK COUNTIES, WASHINGTON |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS','OSM' |
|
| 07/28/09 |
09/787 |
09/08/09 |
DEIS FOR THE EDDY GULCH LATE-SUCCESSIONAL RESERVE FUELS AND HABITAT PROTECTION PROJECT, SALMON RIVER AND SCOTT RIVER RANGER DISTRICTS, KLAMATH NF, SISKIYOU COUNTY, CA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 07/28/09 |
09/778 |
08/10/09 |
DRAFT PAPAHANAUMOKUAKEA MARINE NATIONAL MONUMENT SCIENCE PLAN, NORTHWESTERN HAWAIIAN ISLANDS |
FWS, GS, NPS,MMS |
|
| 07/27/09 |
09/786 |
09/11/09 |
BULLDOG PROJECT ON MS RIVER LOCK AND DAM 27, FERC NO. 13385-000, APPLICATION FOR PRELIMINARY PERMIT, MADISON AND ST CLAIR COUNTIES, IL, AND ST LOUIS COUNTY, MO |
'FWS', 'GS', 'NPS' |
|
| 07/27/09 |
09/785 |
09/11/09 |
BOWERSOCK MILLS AND POWER COMPANY KANSAS RIVER PROJECT, APPLICATION FOR PRELIMINARY PERMIT, DOUGLAS COUNTY, KS |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 07/27/09 |
09/784 |
09/11/09 |
GENERAL SULLIVAN AND LITTLE BAY TIDAL ENERGY PROJECT, APPLICATION FOR PRELIMINARY PERMIT, ROCKINGHAM AND STRAFFORD COUNTIES, NEW HAMPSHIRE |
FWS, GS, NPS,MMS |
|
| 07/27/09 |
09/783 |
09/11/09 |
THOMASTON DAM PROJECT, APPLICATION FOR PRELIMINARY PERMIT, LITCHFIELD COUNTY, CONNECTICUT |
BIA, FWS, GS, NPS |
|
| 07/27/09 |
09/782 |
08/26/09 |
90-DAY FINDING FOR A PETITION TO REVISE DESIGNATED CRITICAL HABITAT FOR ELKHORN AND STAGHORN CORALS, T&E SPECIES CRITICAL HABITAT |
BIA, FWS, GS, NPS,MMS |
|
| 07/27/09 |
09/780 |
10/16/09 |
NOI FOR GRAPEVINE CANYON WIND PROJECT, COCONINO COUNTY, AZ |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 07/27/09 |
09/779 |
10/16/09 |
SWEIS FOR NEVADA TEST SITE AND OFF-SITE LOCATIONS IN NEVADA |
BIA, BLM, BOR, FWS, GS, NPS |
|
| 07/24/09 |
09/781 |
09/29/09 |
YORK HAVEN HYDROELECTRIC PROJECT, NOI TO FIEL APPLICATION, PAD, SD, COMMENTS ON PAD, SD, AND STUDY REQUESTS, DAUPHIN, LANCASTER, AND YORK COUNTIES, PENNSYLVANIA |
FWS, GS, NPS |
|
| 07/24/09 |
09/777 |
09/10/09 |
PROPOSED RULE OF ATLANTIC SHARK MANAGEMENT MEASURES, NOA AMENDMENT 3 TO CONSOLIDATED ATLANTIC HIGHLY MIGRATORY SPECIES FMP, AND DEIS, ATLANTIC SHARK |
BIA, FWS, GS, NPS,MMS |
|
| 07/24/09 |
09/11 |
08/21/09 |
DESABLA-CENTERVILLE HYDRO PROJECT, NOA FINAL ENVIRONMENTAL ASSESSMENT, FERC NO. 803-087, BUTTE COUNTY, CALIFORNIA |
'BIA', 'BLM', 'BOR', 'FWS', 'GS', 'NPS' |
|
|
|